My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 3:51:36 PM
Creation date
10/4/2018 9:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 2003
FileName_PostFix
2003
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US75YS7EM DRAWIN INFORMATION „ <br /> 1. Three complete sets of plans(include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3 Plot plan to show location of tanks and all associated piping. <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. Tank cross-sectional diagram. <br /> g, Detail of tank,associated piping,excavation and cover. <br /> 7, Tank(s)and piping approved by a nationally recognized independent testing organization. [Title 23,Chapter 16, <br /> Article 3,Section 2631 (b)&2635] <br /> 6. Verification of product compatibility with the tank(s),piping,monitoring <br /> device(s), epoxy or silicone glues,etc. <br /> 9. .. Manufacturer's written installation instructions for tank(s),piping, monitoring devices,etc. <br /> 10. At the installation site,prior to installation,a tightness test shall be performed on both primary(1°)and secondary <br /> (20)containment systems before covering. [Section 2635(a)(3)&(4)] <br /> 11. Tank integrity test required upon completion of installation with tank in operatingHalth&Safety Test Division t beChapter <br /> submitted directly to EHD from the testing company or owner of facility. [ ty <br /> 6.7, Section 25291 (h)] <br /> 12. TANKC MPOSITION <br /> TANK# <br /> CA ACITY <br /> MAN FA TURER <br /> OMP ITION <br /> M DEL <br /> PRO UCT <br /> CORROSION <br /> PR TECTION <br /> L. I TED <br /> COMPATIBILITY <br /> WITH 100% <br /> METHANOL <br /> 13. TANK(s)TO BE INSTALLED <br /> _ <br /> A. Steel-clad with fiberglass reinforced plastic coatings,composites,or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> _ (2) Vacuum applied to interstitial space. <br /> o Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular(primary tank pressure test). <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.