My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 3:51:36 PM
Creation date
10/4/2018 9:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 2003
FileName_PostFix
2003
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING SYSTEM CERTIFICATION <br /> For Use By All Jurisdictions Within the State of California <br /> Authority Cited: Chapter 6.7, Health and Safety Code:Chapter 16, Division 3, Title 23, California Code of Regulations <br /> This form must be used to document testing and servicing of monitoring equipment. A separate certification or report mast be prepared <br /> for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank <br /> system owner/operator. The owner/operator trust submit a copy of this form to the local agency regulating UST systems within 30 <br /> days of test date. <br /> A. General Information <br /> Facility Name: aetlean Bldg.No.: <br /> Site Address: y0d ajjj,/ City: ceT Zip. <br /> Facility Contact Person: Contact Phone No.:( ) <br /> Make/Model of Monitoring System:I/P'Ji,r- 4e i- Date of Testing/Servicing: LL/-LL/-Cl <br /> B. Inventory of Equipment Tested/Certified <br /> Check the appropriate boxes to indicatespecific equipment Ins ected/serviced: <br /> T nk ID: &ALAII Tank ID: 011 <br /> In-Tank Gaugi g Probe. Model: In-Tank Gauging Probe. Model: <br /> - U- <br /> Annular Space or Vault Sensor. Model: Annular Space or Vault Sensor. Model: <br /> Rl Piping Sump/Trench Sensor(s). Model: 41 Piping Sump!Trench Sensor(s). Model: S- <br /> Fill Sump Senson s). Model: ]o Fill Sump Sensor(s). Model: <br /> Mechanical Line Leak Detector. Model: 0 Mechanical Line Leak Detector. Model: <br /> 0 Electronic Line Leak Detector. Model: 0 Electronic Line Leak Detector. Model: <br /> 0 Tank Overfill/High-Level Sensor. Model: 0 Tank Overfill/High-Level Sensor. Model: <br /> 0 Others eci a ui ment a and model in Section E on Pae 2). 0 Others 6 equipment a and model in Section E on Page 2). <br /> Tank ID: o . Tank ID: <br /> In-Tank Gauging probe. Model: - Cl In-Tank Gauging Probe, Model: <br /> Annular Space or Vault Sensor. Model: O Annular Space or Vault Sensor. Model: <br /> 19 Piping Sump/Trench Sensor(s). Model:79 j 3d- 0 Piping Swnp!Trench Sensor(s). Model: <br /> RaFill Sump Sens-or(s). Model:79 V.jfld-Ltsk 0 Fill Sump Sensor(s). Model: <br /> ❑ Mechanical Line Leak Detector. Model: 0 Mechanical Line Leak Detector. Model: <br /> 0 Electronic Line Leak Detector. Model: 0 Electronic Line Leak Detector. Model: <br /> O Tank Overfill/High-Level Sensor. Model: 0 Tank Overfill/High-Level Sensor. Model: <br /> 0 Other(specify equipment a and model in Section E on Pa&e 2). 0 Other(specify equipment and model in Section E on Pae 2). <br /> Dispenser ID: 1- Z Dispenser ID: <br /> MDispenser Containment Sensor(s). Model: Ir )0 Dispenser Containment Sensor(s). Model: d - <br /> 0 Shear Valve(s). 0 Shear Valve(s). <br /> ❑ Dis enser Containment Floats and Chains . 0 Dispenser Containment Floats and Chain(s). <br /> Dispenser ID: 3-1 Dispenser ID: <br /> OL Dispenser Containment Sensor(s). Model: - 0 Dispenser Containment Sensor(s). Model: <br /> 0 Shear Valve(s). 0 Shear Valve(s). <br /> 0 Dis enser Containment Floats and Chains . 0 Dis enser Containment Float(s and Chain(s). <br /> Dispenser ID: - Dispenser ID: <br /> 91 Dispenser Containment Sensor(s). Model: 0 Dispenser Containment SenaOr(s). Model: <br /> 0 Shear Valve(s). 0 Shear Valve(s). <br /> ❑Dis enser Containment Float(s)and Chain(s). 0 Dispenser Containment Floal(s)and Chain(s). <br /> -if the facility contains more tanks or dispensers,copy this form. Include information for every tank and dispenser at the facility. <br /> C. Certification -1 certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br /> guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this information is <br /> correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports,1 have also <br /> attached a copy of the repoJy (cyeck a rl t apply): Z System set-up !V his report <br /> Technician Name(print): ,A{� l�' Signature: P ' <br /> Certification No.:;)6 6 6 License.No.: 491948 <br /> Testing Company Name: CENTRAL PETROLEUM MAINTENANCE Phone No.:( 925 ) 462-4060 <br /> Site AddressA y&I dA1LA r41J,- T ,v Date of Testing/Servicing:_L�jJL /l2? <br /> UN-036-1/4 Page I of 3 Rev.06/04101 <br /> www.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.