My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 3:51:36 PM
Creation date
10/4/2018 9:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 2003
FileName_PostFix
2003
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NP-W <br /> Monitoring System Certification <br /> F. In-Tank Gauging/ SIR Equipment: R Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes ❑ No* Was accuracy of system product level readings tested? <br /> Yes ❑ No* Was accuracy of system water level readings tested? <br /> Yes ❑ No* Were all probes reinstalled properly? <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> " In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): Check this box if LLDs are not installed. <br /> Com tete the following checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: ❑ 3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> O Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> UN-036-3/4 Page 3 of 3 Rem.06/04/01 <br /> www.unidomorg <br />
The URL can be used to link to this page
Your browser does not support the video tag.