My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 3:51:36 PM
Creation date
10/4/2018 9:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 2003
FileName_PostFix
2003
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTHDEPARTMENT <br /> r` z Donna K.Heran,R.E.H.S. SAN JOAQUIN COUNTY UnitSupervisors <br /> Director <br /> 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> AI Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> • cy: ,N;i • Program Manager Telephone: 209 468-3420 Douglas W.Wilson,R.E.H.S. <br /> coR Laurie A.Cotulla,R.E.H.S. p ( ) Margaret Lagorio,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> April 7,2003 Mark Bareelios,R.E.H.S. <br /> Balch Petroleum <br /> PO Box 361230 <br /> Milpitas CA 95036-1230 <br /> RE: Tracy Chevron: 3400 MacArthur Blvd.,Tracy California <br /> Your application for permit to install a new underground storage tank system at the above <br /> location has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District <br /> for applicable permits. <br /> 2. Any changes shall be submitted to EHD for approval prior to commencing work. All new <br /> submittals supercede the previous ones. <br /> 3. If the underground storage tank and associated piping are not installed by July 1, 2003 then <br /> the new monitoring system requirements and construction requirements under Assembly Bill <br /> 2481 must be satisfied. An addendum to this permit must be submitted and approval must be <br /> received prior to commencing work. <br /> 4. Contractor training records for the APT and Smith Fiberglass piping must be submitted prior <br /> to commencing work. <br /> 5. Both primary and secondary pipes shall bear a UL label. <br /> 6. All pipe fittings and connections shall bear a UL label. <br /> 7. All monitoring systems shall be listed on the LG113-16. <br /> 8. All testing shall be in compliance with manufacturer's instruction, section 2635 and section <br /> 2636 of California Code of Regulations(CCR). Note:APT piping requires a 1-hour pressure test. <br /> 9. Automatic pump shutdown must satisfy CCR 2636(g). <br /> 10. All piping must slope to a containment sump with an audible/visual alarm. <br /> 11. All equipment in contact with backfill must be corrosion protected. <br /> 12. Overfill prevention must satisfy CCR 2635(b)(2). The audible/visual overfill alarm must be <br /> mounted in the sight/hearing range of the delivery driver. <br /> 13. An accurate and drawn-to scale-as-built plan must be submitted to EHD prior to the final <br /> inspection. <br /> 14. A complete monitoring and response plan must be submitted prior to the final inspection. <br /> 15. All lines and tanks shall be tested for tightness, in accordance to manufacturer's guidelines <br /> by a licensed tank tester and results received prior to the final inspection. <br /> 16. Contact Steven Shih, REHS at (209) 468-9850 for inspections. See inspection checklist for <br /> the required inspections. <br /> 17. All inspection appointments must be scheduled 48 hours in advance. <br /> Thank you, <br /> C.�. R <br /> Michelle Lee,, REH <br /> Senior Registered Environmental Health Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.