My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 3:51:36 PM
Creation date
10/4/2018 9:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 2003
FileName_PostFix
2003
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Md*,,, 'ig equipment to be installed .r <br /> Manufacturer: <br /> Model Number: TL5, 1 <br /> Sensor Type: —Vapor_/� Liquid_Both. <br /> _ Sensor/Panel specifications. <br /> Locations)for sensors <br /> Tank: ic1U A44VPiping: S( '. <br /> Dispenser: CLXV0 <br /> C. Monitoring and response plan submitted[Section 2632(d) (1)&(2)]. <br /> 15. Any special accessories,fittings,coatings,or linings not Inherent within the initial design of the 1°tank or double-wall <br /> UST. [Section 2631 (b)] <br /> A. Approved by a nationally recognized independent testing organization. <br /> _ B. Demonstration of integrity with the primary and/or secondary containment. <br /> 16. Tanks subject to floatation. [Section 2635(a)(7)] <br /> A. Anchored by deadman or slab. <br /> ✓/ B. Anchors to be installed as specified by manufacturer. <br /> C. Installation details provided on plans. ' <br /> D. Calculations provided. <br /> 17. SPILL AND OVERFILL PREVENTION <br /> Underground storage tank equipped with spill container and an overfill prevention system. (detail drawing of spill <br /> container(s)/piping sump(s)required, including tank fill and all openings). <br /> A. Spill container[Section 2635(b)(1)]. <br /> _, / If�made of metal, exterior wall protected from galvanic corrosion. <br /> (/ Capacity: (minimum of five gallons) 0C II%4 Y1 <br /> Equipped with a drain valve whichallowsdrainage of spill into primary container. <br /> Manufacturer: qh t <br /> B. / Overfill prevention system does not allow for manual override and meets one of the following requirements: <br /> ✓_/ (1) Alert transfer operator at 90%full by restricting the flow into the tank or triggering an audible and <br /> visual alarm[Section 2635(b)(2)(A)]. <br /> Manufacturer: Model: ' <br /> _ (2) Restrict delivery flow to the tank 30 minutes before overfill when tank is filled at no more than 95% <br /> capacity and activates an audible alarm at least five minutes before overfill[Section 2635(b)(2)(B)]. <br /> Manufacturer: Model: <br /> (3) Provide positive shut off at no more than 95%capacity[Section 2635(b)(2)(C)]. <br /> Manufacturer: Model: <br /> (4) Provide positive shut-off of flow to the tank so that the fittings on top of the tank are not exposed to <br /> the product overfilling [Section 2635(b)(2)(D)]. <br />
The URL can be used to link to this page
Your browser does not support the video tag.