Laserfiche WebLink
_ Autoi,—dc line leak detectors will.be installed on press—Led piping <br /> Manufacturer: Model: <br /> _ Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> _ Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring <br /> system fails or is disconnected. <br /> 20, State Water Resources Control Board"Facility(A)"and'Tank Permit(B)"application forms submitted. <br /> 21. A,� Plan review and operating permit fees paid. <br /> 22. What is the approximate depth to ground water: [1 (L <br /> (include source of information-borehole logs, monitoring well data,water <br /> studies,etc.) <br /> 23. c-;)� Total number of tanks on site after installation: <br /> 24, '� County/City Fire District and Building Department notified. <br /> 25, _✓ In the event contamination is observed,confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility[in accordance with (CCR)Title 23, Division 3,Chapter 16,Article 11,Corrective Action Requirements) <br /> as an owner.or operator to submit a workplan to EHD Site Mitigation Unit prior to initiating any assessment or <br /> remediation activities. For further assistance contact the Site Mitigation Unit at(209)469-3450. <br /> /f ,�/�//��The owner or operator must acknowledge this responsibility for workplan submittal by signature and date <br /> /below. <br /> Name(— l��l��l r Titlef4racka-j a Date <br /> CONDITIONS OF APPROVAL: <br /> 9 <br />