Laserfiche WebLink
IFIED PROGRAM CONSOLIDATED FOR <br /> TANKS <br /> UNDERGROUND STORAGE TANKS -TANK PAGE 2 Y� <br /> Pae of <br /> VL PIPING CONSTRUCTION Ohed dl that <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE C1 1.PRESSURE [-12.SUCTION ❑3.GRAVITY 458. [11.PRESSURE [12.SUCTION [13.GRAVITY 459. <br /> CONSTRUCTION/ [11.SINGLE WALL ❑3.LINED TRENCH ❑99.OTHER 460. ❑L SINGLE WALL [195.UNKNOWN 462, <br /> MANUFACTURER 2 DOUBLE WALL ❑95.UNKNOWN [12.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER 461, MANUFACTURER 463. <br /> ❑1.BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL ❑1.BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL <br /> ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL <br /> ❑3.PLASTIC COMPATIBLE WITH CONTENTS [395.UNKNOWN [13.PLASTIC COMPATIBLE W/CONTENTS [18.FLEXIBLE(HDPE) ❑99.OTHER <br /> IQ <br /> ❑4.FIBERGLASS P 8.FLEXIBLE(HDPE) [199,OTHER ❑4.FIBERGLASS ❑9.CATHODIC PROTECTION <br /> [15.STEEL W/COATING ❑9.CATHODIC PROTECTION 464. [:15.STEEL W/COATING ❑95.UNKNOWN 465. <br /> VIL PIPING LEAK DETECTION Check all that A A.cri tienofthe monh9r coram a W l be wbated m the bcd <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466. SINGLE WALL PIPING 467, <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> 1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP [31. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> SHUT-OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION SHUTOFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION <br /> +AUDIBLE AND VISUAL ALARMS. +AUDIBLE AND VISUAL ALARMS. <br /> [12. MONTHLY 0.2 GPH TEST [12. MONTHLY 0.2 GPH TEST <br /> ❑3. ANNUAL INTEGRITY TEST(0.1 GPH) 0 3. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> [14+ DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> ❑5. DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING C15. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): [16. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> [17+ SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW [17+ SELF MONITORING <br /> ❑9. BIENNIAL INTEGRITY TEST(0.1 GPH) GRAVITY FLOW(Check all that apply): <br /> [18. DAILY VISUAL MONITORING <br /> [19. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10, CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check am) ALARMS AND(Check om) <br /> Y a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ❑b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> []c. NO AUTO PUMP SHUT OFF []c. NO AUTO PUMP SHUT OFF <br /> 11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT 11 AUTOMATIC LEAK DETECTOR <br /> OFF OR RESTRICTION <br /> ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTIONIGRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS 013. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> [114. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> C]15. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITHOUT FLOW 15. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> SHUT OFF OR RESTRICTION <br /> ❑16. ANNUAL INTEGRITY TEST(0.1 GPH) ❑16. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑17. DAILY VISUAL CHECK ❑17. DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT 468. FOE <br /> FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4. DAILY VISUAL CHECK 469. <br /> DATEMSTALLED CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑5. TRENCWLINER MONITORING <br /> CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR [16. NONE <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS <br /> IX.OWNER/OPERATOR SIGNATURE <br /> I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> SIGNATURE OF OWNER/ PERATOR DATE: Oro' <br /> NAME OF OWNER/OPERATOR(print): TITLE OF OWNER/OPERATOR: an. <br /> G <br /> Permit Numb.(Agency me only) 473 1 Permit Approved By(Agency use only) 474 1 Permit Expiration Dare(Agency use only) 475. <br /> UPCF hwfwrc-b(1/99)-3/4 http://www.unidoc&org Rev.02/16/00 <br />