Laserfiche WebLink
Monitoring System Certification <br /> F. In-Tank Gauging/ SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perforin leak detection monitoring. <br /> Complete the following checklist: <br /> aHas all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Was accuracy of system product level readings tested? <br /> Was accuracy of system water level readings tested? <br /> Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe hew and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ® Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: S 3 g.p.h.; [10.1 g.p.h; ❑ 0.2 g.p.h. <br /> ® Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ® N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ® N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> IK N/A <br /> ® Yes I ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: DIESEL AND 87 PRODUCT PASSED FIRST TEST----HAD TO REPLACE SIPHON JET ASSY AND <br /> PURGE TO GET 91 PRODUCT TO PASS------OK------( 3.0 GPH TEST ) <br /> ;Z//1/09 — JqpP14CeQ D ✓cer ' Ij exdetrM cul <br /> Page 3 of 3 <br /> UN-036—1/4 www.unidocs.org Rev.01/26/06 <br />