My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 3:05:06 PM
Creation date
10/4/2018 2:59:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
DSedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/14/00 FRI 17:06 FAX 916 36" 1889 SECOR-SACRAMENTO IN <br />SECOR <br />lnternatimal lncoToraled <br />April 14, 2000 <br />Project 077.41991 <br />Mr. Marty Hartzell <br />RWQCB — Central Valley Region <br />3443 Routier Road, Suite A <br />Sacramento, CA 95827-3003 <br />Re: Change in Scope of Assessment Work <br />Former Chevron Service Station #9-5775 <br />301 W. Kettleman <br />Lodi, California <br />Dear Mr. Hartzell: <br />This letter, prepared by SECOR International Incorporated (SECOR) on behalf of Chevron <br />Products Company (Chevron), presents proposed revisions to the compliance dates and text <br />of the Site Specific Investigation and Cleanup Tasks listed in the draft Cleanup and <br />Abatement Order (CAO) faxed on April 11, 2000 and discussed in our meeting on April 12, <br />2000. <br />Task 2: Install and continuously operate an interim pump and treat system in the area of the <br />highest groundwater MtBE contamination. Compliance date: 1 July 2000. <br />Task, 3: (unchanged — task has been implemented by City of Lodi [note: City of Lodi has <br />denied Gettler-Ryan access to City Well 12]) <br />Task 4: (unchanged) <br />Task 5: add the following to the end of the task description: If the findings of the work <br />performed under the workplan required in Task 4 do not, in the opinion of the Board staff, <br />adequately define the lateral and vertical extent of petroleum hydrocarbons and fuel <br />oxygenates both on and off site, further assessment work will be required and the PAR <br />compliance date noted here will be delayed appropriately. Compliance date: July 24, 2000. <br />Task 6: (text unchanged other than reference to compliance date) Compliance date: <br />September 25, 2000 <br />r 912 IIUS ne.cl NVI--1 0711W, .Snit& IOU, Saoeinuwfo, CA 958.27 (91(5).-3044880 (916).364- 1 NH.9 F(v a rrus<:c:r>r,r:r,ru <br />
The URL can be used to link to this page
Your browser does not support the video tag.