My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 3:05:06 PM
Creation date
10/4/2018 2:59:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
DSedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan For Monitoring Well Installation — Former Chevron Service Station #9-5775, Lodi, CA <br />April 7, 2000 <br />Task 5. Laboratory Analyses <br />Soil and groundwater samples will be submitted for chemical analysis at Sequoia Analytical, a <br />California state -certified Hazardous Material Testing Laboratory (ELAP #1210, #1271, and <br />#1624). Selected soil samples will be analyzed for TPHg, BTEX, and MtBE by DHS LUFT. <br />Detectable concentrations of MtBE by DHS LUFT will be confirmed by EPA Method 8260. <br />Groundwater samples will be analyzed for TPHg, BTEX, and MtBE by DHS LUFT, and the fuel <br />oxygenates MtBE, TBA, DIPE, TAME and ETBE by EPA Method 8260. The sample of the <br />stockpiled drill cuttings will be analyzed for TPHg and BTEX by DHS LUFT, and total lead by <br />EPA 6000/7000 Series Methods. <br />Task 6. Report Preparation <br />Following receipt and analysis of all data, a report will be prepared which summarizes the <br />procedures and findings associated with this investigation. This report will be submitted to <br />Chevron for their use and distribution. <br />PROJECT STAFF <br />Mr. Stephen J. Carter, a Registered Geologist in the State of California (R.G. No. 5577), will provide <br />technical oversight and review of the work. Mr. Greg Gurss, Senior Project Manager, will supervise <br />implementation of field and office operations. GR employs a staff of geologists, engineers, and <br />technicians who will assist with the project. <br />Implementation of the proposed scope of work will commence upon receipt of regulatory approval. <br />346408.09 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.