My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO 2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:54:01 PM
Creation date
10/4/2018 3:59:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2010-2015
FileName_PostFix
2010-2015
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'UST$YSTEM RET'RorIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD). <br /> 1. Site map e6closed2 YES I1 NO[] <br /> 2. SUbmli-00101 Qf jGGAgrvio Technician and/or Installers certificate and all manufacturer,.tl'alning Gooffcat@ for ag <br /> person Installing ortestlo(1 any component that Is repaired or replaced. Ensure a ropy of the",Site Health and Safety>. <br /> Plan"Is available on th©Jotisite as required by Title H. <br /> 3. Detailed description of work to.be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done: (If <br /> adding piping, UDC's, or other LIST equipment,or performing tank top upgrade,use the UST Installation Application <br /> pages 4-6 as necessary for a timely plan revlew)r <br /> q1 <br /> r <br /> (*j). <br /> cci Cit, d I of 3 On r hot IIP�r �'l0 Pyr <br /> 4. List of equipment to be used(Attaoh maifuiW ei speoiflcallon sheets showing thing-party approval): <br /> n! Lc MJY <br /> 1 <br /> �t lC:f 0r ". <br />
The URL can be used to link to this page
Your browser does not support the video tag.