My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO 2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:54:01 PM
Creation date
10/4/2018 3:59:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2010-2015
FileName_PostFix
2010-2015
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R[[tTapk Gaugi^9/SIR Equipment: r— <br /> Check this box If tank gauging Is used only for inventory control. <br /> r Check this box If no tank gauging or SIR equlpment Is installed. <br /> This section must be completed If in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> proper entry and termination,including testing for ground fauhs? <br /> IT Yes r No' as all input willing been Inspected for <br /> r Yes r No' ere all tank gauging probes visually inspected for damage and residue buildupf <br /> It yes r No' as accuracy of system product level readings tested? <br /> (: yg IF No' as accuracy of system water level readings tested? <br /> r yesi r No' ere all probes reinstalled properly? <br /> r Yes r No' ere all items on the equipment manufacturer?s maintenance checklist completed? <br /> •In the Section H,below,describe how and when these deficiencies were or will be corrected_ <br /> G.Line Leak Detectors(LLD): r Check this box If LLDs are not installed. <br /> Complete the following checklist: <br /> G Yes <' No, or equipment start-up or annual equipment cemncation was a leak simulated w verify LLD performance?(Check all that <br /> apply)Simulated leak rate:r 3 g.p.h.; r 0.1 9-P III r-; 0.2 g.p.h. <br /> (- N/A <br /> IT yes f No' ere all LLDs confirmed operational and accurate within regulatory requirements? <br /> r yes r No' as the testing apparatus property calibrated? <br /> r yes r No' or mechanical LLDs,does the LLD restrict product now it it detects a leak? <br /> r N/A <br /> (.. Yes r No, or electronic LLDS,does the turbine automaticaliy shut off if the LLD detects a leak? <br /> r N/A <br /> • Yes r No' r eleLtronic LLDs,does the turbine au[oma[i(ally shut off If any portion of the mon2oring system is disabled or disconnected? <br /> r N/A <br /> r Yes r No' or electronic LLDS,does the turbine automatically shut off if any portion of the monimnng system malfunctions or fails a test? <br /> r N/A <br /> • yes r No' or electronic LLDS,have all accessible wiring connections been visually inspected? <br /> r N/A <br /> r yes r No' ere all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In the Section H,01 describe how and when these deficiencies were or will be corrected. <br /> H. Comment <br /> Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.