Laserfiche WebLink
D.Results of Testing/Servicing <br /> Software Version Installed: 329.01 <br /> Complete the following checklist: <br /> • Yes Isthe audible alarm operational? <br /> IT Yes r No* Is the visual alarm operational? <br /> • Yes r No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> • Yes r No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere witt <br /> eir proper operation? <br /> • Yes r No* if alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> N/A <br /> • Yes C No* or pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring <br /> stem detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check <br /> N/A II that apply)F'.Sump/Trench Sensors; FV Dispenser Containment Sensors. <br /> id you confirm positive shut-down due to leaks and sensor failure/disconnection?r Yes; r No <br /> • Yes r No* r tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill <br /> revention valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If <br /> r N/A m,at what percent of tank capacity does the alarm trigger?90% <br /> • Yes* r No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E below. <br /> • yes. r No Was liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) <br /> Product r Water.If yes,describe causes in Section E below. <br /> • Yes r No* as monitoring system se[-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> • Yes r No* s all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E Coinments: <br /> Monitoring System Certification Page 2 of 3 12/07 <br />