Laserfiche WebLink
Page 1 of 1 <br /> SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Fill Riser Containment Sumps <br /> Fill Riser Containment Sumps are Present, but were Not Tested ❑ <br /> Test Method Developed By: r Spill Bucket Manufacturerig Industry Standard if Professional Engineer <br /> r Other (Specify): <br /> Test Method Used By: r Pressure 6 Vacuum a Hydrostatic <br /> r Other (Specify): REG TESTED WITH VACUUM TEST <br /> AFTER REPAIRS <br /> Test Equipment Used: LAKE TEST Equipment Resolution: 0.0625 in. <br /> Spill Box # Spill Box # Spill Box # <br /> Tank T1 PREMIUM Tank T3 Diesel Tank T2 REGULAR Spill Box # <br /> Fill - Direct Fill - Direct Fill - Direct <br /> Bucket Diameter: 12.00 12.00 12.00 <br /> Bucket Depth: 13.50 13.00 12.50 <br /> Wait time between applying <br /> pmssure/vacuum/water and 5 min 5 min 5 min min <br /> starting test <br /> Test start Time: 10:10:00 10:10:00 16:36:00 <br /> Initial Reading a,1 13.50 in. 13.00 in. 30.00 in. H2O <br /> Test End Time: 11:10:00 11:10:00 16:37:00 <br /> Final Reading 13.50 in. 13.00 in. 29.00 in. H2O <br /> Test Duration: 1 hr I hr 1 min <br /> Change in Reading 0.M): 0.00 in. 0.00 in. -1.00 in. H2O <br /> Pass/Fail Threshold or Criteria: +/- 0.00 +/- 0.00 +/- 4.00 +/- <br /> Test Result: I Pass Pass Pass <br /> Comments 7 (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO: 2302414 <br />