My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO 2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:54:01 PM
Creation date
10/4/2018 3:59:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2010-2015
FileName_PostFix
2010-2015
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 1 of 1 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: r Piping Manufacturer r, Industry Standard r Professional Engineer <br /> F Other(Specify) <br /> Test Method Used By: R_ Pressure F vacuum Hydrostatic <br /> r Other(Specify) <br /> Test Equipment Used: gauge Equipment Resolution: .001 <br /> (rankTI-PREMIUM) (Tank T2-REGULAR) (Tank'f3-Diesel)STP <br /> STP Containment 1 to STP Containment 1 to Containment 1 to 7/8 <br /> 7/8 7/8 <br /> Piping Material: dw flex dw tlex dw flex <br /> Piping Manufacturer: total containment total contanment total contanment <br /> Piping Diameter: 2 in. 2 in. 2 in. in. <br /> Length of Piping Run: 130 ft. 130 ft. 130 ft. ft. <br /> Product Stored: PREMIUM REGULAR Diesel <br /> Method and location of <br /> i in -run isolation: sump sump sump <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min min <br /> starting test: <br /> Test Start Time: 10:15:00 12:10:00 12:10:00 <br /> Initial Reading(RI): 5.00000 PSI 5.00000 PSI 5.00000 PSI <br /> Test End Time: 11:15:00 13:10:00 13:10:00 <br /> Final Reading(RF): 5.00000 PSI 5.00000 PSI 5.00000 PSI <br /> Test Duration: 1 hr 1 hr 1 hr <br /> Change in Reading(RF-Rt): 0.00000 PSI 0.00000 PSI 0.00000 PSI <br /> Pass/Fail Threshold or +/-0.00000 +/-0.00000 +/-0.00000 +/- <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br /> nrC <br /> wssâ– V s <br /> CAI\/1Qf1RIAACAITAL <br /> HEALTH DEPARTMENT <br /> WO:2317562 <br />
The URL can be used to link to this page
Your browser does not support the video tag.