My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO 2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:54:01 PM
Creation date
10/4/2018 3:59:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2010-2015
FileName_PostFix
2010-2015
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 1 of 1 <br /> 7.UNDER-DISPENSER CONTAINMENT C TESTING <br /> est Method Developed By: UDC Manufacturer V Industry Standard Professional Engineer <br /> F Other S eci <br /> Test Method Used By: r Pressure F Vacuum r Hydrostatic <br /> 7 Other(Specify) <br /> Test Equipment Used: VPLF Equipment Resolution:0.00001 in. <br /> UDC#1/2 UDC#3/4 UDC#5/6 UDC#7/8 <br /> UDC Manufacturer: total containment total containment total contanment total containment <br /> UDC Material: <br /> UDC Depth: 32.00 32.00 32.00 32.00 <br /> Height from UDC Bottom to Top 9.00 9.00 9.00 9.00 <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 6.00 6.00 6.00 6.00 <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to good good good good <br /> testing: <br /> Portion of UDC Tested' I1 I I l I I l <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both a yes r Nor NA fT Yes f Nor NA a Yes r Nor NA G Yes r No r NA <br /> product and water)?* <br /> Turbine shutdown response time 02:00:00 we 02:00:00 see 02:00:00 sec 02:00:00 sec <br /> Is system programmed for fail- rw yes r Nor NA (i Yes r Nor NA r Yes r Nor NA r. Yes r Nor NA <br /> safe shutdown?* <br /> Was fail-safe verified to be C yes r Nor NA a Yes r Nor NA Q Yes r Nor NA 6+ Yes r Nor NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test <br /> Test Start Time: 11:10:00 10:15:00 11:57:00 11:10:00 <br /> Initial Reading(Rj} 0.00000 in. 0.00000 in. 0.00000 in. 0.00000 in. <br /> Test End Time: 11:25:00 10:30:00 12:12:00 11:35:00 <br /> Final Reading(RF): -0.00030 in. 0.00000 in. -0.00180 in. -0.00090 in. <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading(RF-RI): -0.00030 in. 0.00000 in. -0.00180 in. -0.00090 in. <br /> Pass/Fail Threshold or Criteria: +/-0.00200 +/-0.00200 +/-0.00200 +/-0.00200 <br /> Test Result: .Pass Pass Pass Pass <br /> Was sensor removed for testing? G Yes r Nor NA G Yes r No C NA G Yes r Nor NA r Yes r Nor NA <br /> Was sensor properly replaced and G YesCL Nor NA rC Yes r Nor NA r Yes r No rr NA ro Yes r Nor NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> MAY 0 1 2014 <br /> L <br /> If the entire depth of the UDC is not tested,specify how much was tested.If the answer to any of the questions indicated with an asterisk(•)is"NO"or"NA",the entire UDC must <br /> be tested. <br /> WO:2317562 <br />
The URL can be used to link to this page
Your browser does not support the video tag.