My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO 2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:54:01 PM
Creation date
10/4/2018 3:59:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2010-2015
FileName_PostFix
2010-2015
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVE® <br /> APR 01 2014 <br /> F.In-rank Gauging/SIR Equipment: r Check this box If tank gauging is used only for inventory control. <br /> r Check this box if no tank gauging or SIV"ONMENTAL <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. CHEALTH DEPARTMENT <br /> Complete the following checklist: <br /> • Yes r No* las all Input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> • Yes r No* Nere all tank gauging probes visually Inspected for damage and residue buildup? <br /> • Yes r No* Nas accuracy of system product level readings tested? <br /> IT Yes No* Nas accuracy of system water level readings tested? <br /> • Yes r No* Nere all probes reinstalled properly? <br /> • Yes No* Nere all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> • Yes f No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check all that <br /> N/A pply)Simulated leak rate:r 3 g.p.h.; r 0.1 g.p.h; r 0.2 g.p.h. <br /> • Yes No* Nere all LLDs confirmed operational and accurate within regulatory requirements? <br /> IT. Yes No* Nas the testing apparatus properly calibrated? <br /> G. Yes r No* For mechanical LLDs,does the LLD restrict product flow if It detects a leak? <br /> r N/A <br /> Yes No* or electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> • N/A <br /> • Yes No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> IT N/A <br /> • Yg No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> • N/A <br /> • Yes r No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> • N/A <br /> • Yes No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.