Laserfiche WebLink
SWRCB,January 2002 RECEIVED <br /> 9. SPILUOVERFILL CONTAINMENT BOXES <br /> R V L cui4 <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes r- <br /> SpillJOver iII Containment Boxes are Present,but were Not Tested F <br /> Test Method Developed By: C Spill Bucket Manufacturer r Industry Standard EN <br /> r— Other(Specify): <br /> 'fest Method Used By: r Pressure W Vacuum r Hydrostatic <br /> r Other(Specify): <br /> Test Equipment Used:VACUUM TEST Equipment Resolution:0.1 gph <br /> Spill Box#'Tank T1 Spill Box#Tank T2 Spill Box#'rank T3 <br /> PREMIUM-Fill I- REGULAR-Fill I- Diesel-Fill l-Direct- Spill Box# <br /> Direct-Grade level in Direct-Grade level in Grade level in <br /> containment sump containment sump containment sump <br /> Bucket Diameter: 12.00 12.00 12.00 <br /> Bucket Depth: 12.00 12.00 12.00 <br /> Wait time between applying <br /> pressure/vacuum/water and 1 min 1 min 1 min min <br /> starting test <br /> Test Start Time: 09:00:00 09:03:00 09:00:00 <br /> Initial Reading(R1): -32.00 in.1420 -32.00 in.H2O 11.75 in. <br /> Test End Time: 09:01:00 09:04:00 10:00:00 <br /> Final Reading(RFI -32.00 in.H2O -32.00 in.H2O 11.75 in. <br /> Test Duration: 1 min 1 min I hr <br /> (RF-RI): 0.00 in.H2O 0.00 in.H2O 0.00 in. <br /> Pass/Fail Threshold or Criteria: +/-4.00 +/-4.00 +/-0.25 +/- <br /> Test Result: Pass Pass Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br /> tested die with vacum couldnt get a good seal lake tested and it passed <br /> WO:2317099 <br />