Laserfiche WebLink
SVE/GWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />Date: � � � Time of Arrival: <br />�. <br />Technician: Steve Thompson Time of Departure: <br />Site Engineer: Bob Jackson Time Site Engineer was contacted from field? <br />PART A: GENERAL INFORMATION <br />Site Location: Chevron 9 5775 301 West Kettleman Lane todi CA Project No, 77CH.95775.02.0550 <br />Abatement Equip.: Falmouth Products Falco 10D Catalytic Oxidizer Serial No.: <br />SVE Blower: 5 hp motor, 15.5 Amp AMP Reading: <br />MAX AMP Rating: <br />Telemetry: Sonitrol <br />Electrical Power: 230 V 3 phase — 200 am <br />Supplemental Fuel: <br />No. of K/O barrels at site: <br />PART B: SVE SYSTEM DATA <br />II O'�'--P. Empty <br />Elect, Meter Reading: <br />` 7 - Z! �-, <br />System up or down upon arrival: (it down please complete PART E) <br />Hourmeter Reading: At time: <br />A <br />Previous hourmeter reading <br />B <br />Current hourmeter reading <br />C <br />Current reading minus previous reading <br />4:t-1 <br />--5- <br />Total hours sin�Iast&M event <br />E <br />I C / D X 100 <br />ann n.rr-pn nnera ! <br />! vI o sl a engineer <br />% Operability <br />!]Clot to lea <br />I:\Chevron\95775\Flaid Services Request\O&MDATA Sheet.doc <br />ring site <br />