Laserfiche WebLink
SVE/GWE SYSTEM <br />I FIELD MONITORING DATA SHEETS <br />uate: Time of Arrival <br />Technician: _�� ��`-�ic�f�' Time of Departure:0 _ <br />Site Engineer:_zql-�;"kl Time Site Engineer was contacted from field? <br />PART A: GENERAL INFORMATION <br />Site Location: Chevron 9-5775, 301 West Kettleman Lane, Lodi CA <br />Abatement Equip.: Falmouth Products Falco 100 Catalytic Oxidizer <br />SVE Blower: 5 hp motor, 15.5 Am <br />Telemetry <br />Electrical Power: 230 V 3 phase - 200 am <br />Supplemental Fuel None <br />No. of K/O barrels at site: Full Empty <br />PART B: SVE SYSTEM DATA <br />r• <br />r <br />Project No. 77CH.95775.00.0550 <br />Serial No.: <br />Max AMP Rating: <br />MAX AMP Rating: <br />Elect. Meter Reading: <br />System up or down upon arrival: <br />{If down please complete PART E) <br />Hourmeter Reading: / Gl ��gG. , At time: <br />A <br />Previous hourmeter reading <br />19296.9 <br />@ 10:57 <br />B <br />Current hourmeter reading <br />C <br />Current reading minus previous reading <br />D <br />Total hours since last O&M event <br />E <br />C / D X 100 <br />% Operability <br />r <br />nepu►t percent uperuuuuy to sue engtneer prwr to teavtng sue <br />