Laserfiche WebLink
CLEA.\,uP AND ABATEMENI ORDER NO. 5-00-704 <br />FORMER CHEVRON STATION #9-5775 <br />.141 WEST KETTLEMAN LANE <br />C)DI. SAN JOAQUIN COUNTY <br />Site -Specific fill-estigation and Cleanup Tasks (continued) CO�anCC Date <br />3. install and continuously operate a soil vapor extraction system, and an 3 Jul2000 <br />highest soil and <br />interim pump and treat system in the area of the hi y <br />groundwater MtBE contamination. Tile interim pump and treat <br />sYstcm must stabilize the ground`vater plume to pre"ent movement <br />of AUBE toy%,ard City Well 12. <br />4. Submit a complete Problem Assessment Report (PAR) acceptable to the 24 Ju13, 2000 <br />Board and County staff, as described in Appendix A of the Tri -Regional <br />Recommendations. The PAR must include requirements for any <br />discharge permit(s) required and a time line for submittal of Report(s) of <br />Waste Discharge. <br />5. Within 1S -days Of Board staff approval of the Problem Assessment <br />Report, but no later than 28 August 2000, submit a Final Remediation 28 August 2000 <br />Plan (described in Appendix A) for the cleanup of the soil and <br />groundwater at the site. <br />Within 30 days ofBoard staff approval of the selected Remedial Option, 6 October 2000 <br />but no later than 6 October 2000, implement and continuously operate, <br />the approved remediation system, with the exception of periodic and <br />scheduled maintenance. Any interruption in the opmation of the <br />cleanup system(s), other than for scheduled maintenance, without prior <br />approval of the Executive Officer, is a violation of this Order. <br />t <br />Reporting and Permits <br />7. Notify the Board and County staff at least two business days prior to any site work or sampling. <br />8- ' Obtain all necessary local and state permits prior to beginning Work. <br />9. Submit all reports and correspondence to the Board's Sacraments, nFnr.p. *r,p On.. r...,,,..:., <br />County Environmental Health Division,and all artier or --- <br />P ( representatives) identified in this <br />Order. Under penalty ofpequry, the technical reports as directed, which shall be submitted to the <br />Executive Officer of the Board, and to the County, must be signed by an appropriately licensed <br />professional (technical reports and plans, including drillingto and soil and <br />Sampling, are to be prepared, signed,and � � groundwater <br />certified by a Registered Geologist, Registered Civil <br />Engineer, Certified Engineering Geologist, or Certified Hydrogeologist). All registered <br />professionals must be licensed by the State of Califomia. <br />10. Submit preapprovals with wodcplans and all reports nrith reimbursement requests to the State <br />Water Resources Control Board Cleanup Fund in a timely manner to avoid delays that would <br />result in non-compliance with this Order. <br />.4 <br />