Laserfiche WebLink
SVE/GWE SYSTEM <br />is FIELD MONITORING DATA SHEETS <br />Date Ad / Time of Arrival <br />Technician _� Z'�i�J—� Time of Departure <br />Site Engineer C� �_ S� Time Site Engineer was contacted from field's <br />PART A GENERAL INFORMATION <br />Site Location Chevron 9-5775 301 West Kettieman Lane Lodi CA <br />Abatement Equip Falmouth Products Falco 100 Catalytic Oxidizer <br />SVE Blower 5 hp -motor, 15 5 Amp <br />Telemetry Sonitrol <br />Electrical Power 230 V 3 phase – 200 am <br />Supplemental Fuel None <br />No of K/O barrels at slte Full Emotv <br />PART B SVE SYSTEM DATA <br />r <br />Project No 77CH 95775 00 0550 <br />Serial No <br />Max AMP Rating <br />MAX AMP Rating <br />Elect Meter Reading <br />System up or down upon arrival l aL?�14,l -1 ) z, / {if down please complete PART E) <br />Hounmeter Reading At time <br />A <br />Previous hourmeter reading <br />192969 <br />0 10 57 <br />B <br />Current hourmeter reading <br />C <br />Current reading minus previous reading <br />D <br />Total hours since last O&M event <br />E <br />C / D X 100 <br />% Operability <br />—1 --pc,—'.. vperuasrw,r sv awc crag srscCr plsvi, sv saurslsg aue <br />