Laserfiche WebLink
SVE/GWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />Date: , 7, Time of Arrival: ��• �� <br />Technician: Steve Thompson Time of Departure: c2 <br />Site Engineer: Bob Jackson Time Site Engineer was contacted from field? " d <br />PART A: GENERAL INFORMATION <br />Site Location: Chevron 9-5775 301 West Kettleman Lane Lodi CA Project No. 77CH.95775,00.0550 <br />Abatement Equip.: Falmouth Products Falco 100 Catal is Oxidizer Serial No.: <br />SVE Blower: 5 hp motor, 15.5 AmI2 AMP Reading: �5 <br />MAX AMP Rating: <br />Telemetry: Sonitroi <br />Electrical Power: 230 V 3 phase - 200 amip / - y7 <br />Elect. Meter Reading: T <br />Supplemental Fuel: None <br />No. of WO barrels at site: Full Empty <br />PART B:SVE SYSTEM DATA <br />System up or down upon arrival: - (If down please complete PART E) <br />Hourmeter Reading: �% ���� • At time: fes' <br />A <br />Previous hourmeter reading <br />192964— <br />B <br />Current hourmeter reading <br />C <br />Current reading minus previous reading <br />D <br />Total hours since last O&M event <br />E <br />C / D X 100 <br />°k Operability <br />/e� <br />Reporr percent operaniiuy to sue engcneer prw, to ac"K4115 aa.c <br />