My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003037
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 8:55:31 AM
Creation date
10/9/2018 3:49:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003037
FileName_PostFix
XR0003037
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEANUP AND ABATEM—.•fT ORDER NO 5-00-704 <br />FORMER CHEVRON STATION #9-5775 <br />301 WEST KETTLEMAN LANE <br />LOD]. SAN JOAQUIN COUNTY <br />� <br />5 <br />Quarterly Reporting <br />11 By 15 July 2000, and the 15th day of the month following each calendar quarter, submit a <br />quarterly progress report for the former CheNTon Station #9-5775 site that provides the results of <br />groundwater monitoring, sample analysis and site work performed during the previous calendar <br />quarter Groundwater analysis is to include total petroleum hydrocarbons as gasoline. benzene, <br />toluene, ethyl benzene, total xylenes, ethylene dibromide, 1,2-dichloroethane, MtBE, TBA, <br />DIPE, ETBE, TAME, ethanol, and methanol The quarterly progress reports shall inzlude <br />a Groundwater elevation contour maps <br />b Pollutant concentration contour maps <br />c Groundwater purge data sheets <br />d. Tabular results of current and all previous data <br />e Narrative describing the work presented in the report, including methodology <br />f Discussion of the status of investigation and cleanup activities <br />g Evaluation of the effectiveness of cleanup activities and an estimate of pollu`tmnts treated <br />versus pollutants remaining <br />h A schedule for future activities <br />i Include data from the last three months, document treatment or disposal of azo <br />contaminated soil or groundwater generated during the investigation and cleanup <br />activities <br />12 If groundwater monitoring indicates the groundwater plume has migrated beyond laterally or <br />vertically defined limits during the quarter, the quarterly report shall include a work plan and <br />schedule, with work to begin within thirty days of report submittal, to define the new plume <br />limits ` <br />NVAj$jTON, ExecutiN e Officer <br />Dated 20 April 2000 <br />0 — <br />
The URL can be used to link to this page
Your browser does not support the video tag.