Laserfiche WebLink
SVEIGWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />Date: z' dq2 Time of Arrival <br />)echn1cIan:4.:r- I/— <br />,S y ---T- Time of Departure: <br />Site Engineer: -1)2U, -L-- Was Site Engineer contacted from field? Yes No <br />PART A: GENERAL INFORMATION <br />Site Location: Chevron 9,5775, 301 West Kettleman Lane. LQ -di. CA Project No. 77CH.43452.00.0550 <br />Abatement Equip.: Falmouth Products Falco 100 Catalytic Oxidizer Serial No.: <br />SVE Blower: 5 hp motor, 5. m Max AMP Rating: <br />Telemetry: i2iw MAX AMP Rating: <br />Electrical Power: 230 V_ 3_phase - 200 amp J r <br />Elect. Meter Reading:,/5S_� �J <br />Supplemental Fuel: Non <br />No. of IVO barrels at site: Full Empty <br />PART B: SVE SYSTEM DATA <br />11) <br />• <br />System up or down upon arrival: (If down please complete PART E) <br />Hourmeter Reading: Z -77 _57—,7 At time: <br />Flow Data <br />Before Adjustment <br />After Adjustment <br />Final <br />% Dilution air valve open <br />% Recirculation valve open <br />d <br />KID Content I <br />Vacuum 0 blower (in H2O) <br />Gauge Flange <br />d t <br />AMPS drawn blower motor AMPS <br />Total System Flow (A P, in H2O) <br />Pipe Size <br />g` f <br />e2 <br />Well Field Air Flow (A P, in H2O) <br />Pi22 Size t 4" <br />Dilution Air Flow (A P, "H2O) <br />Pipe Size " <br />FID Data <br />W/ Carbon <br />W/O Carbon <br />Difference <br />S tem Influent my before dilution <br />S stem Influent my after dilution <br />$ stem Effluent my <br />Field Instrument Used: Last Calibrated: . Ci <br />