Laserfiche WebLink
TOTE INFORMATION FORM <br />Identification <br />Project #: 077.43452.550 <br />Station ID 4. Chevron 9-5775 <br />FIELD SERVICES REQUEST <br />Site Address: 3ol West Kettleman Lane <br />Lodi, CA <br />Lab: Lancaster Laboratories <br />County: San Joaquin <br />Project Manager: Ron Chinn <br />Requester: Greg McIver <br />Client: Chevron Products Com an <br />Client P.O.C: Bob Cochran <br />Date of Request: 23 -Aug -2001 <br />F <br />Protect Type <br />❑X Operation & Maintenance <br />0 Sampling <br />F] 1 st Time Visit <br />Quarterly <br />-1st —2nd 3rd 4th <br />Monthly <br />❑ Semi -Monthly <br />0 Weekly <br />❑ One Time Event <br />Other: <br />Field Date: Wednesdays at 10 am <br />9 Sample SVE system (bag samples) according to the following schedule <br />0 <br />Take bag samples on even dated Wednesdays <br />2 Sample GWE system (water samples) according to the following schedule <br />Check Appropriate Category <br />[x Budget Site Visit <br />[� Out of Budget Site Visit <br />Budget Hours: 2/4 <br />Actual Hours: <br />Mob/de Mob: 2 <br />Site Safety Concerns <br />See Health and Safety Plan <br />Analyze samples by 8280 for oxygenates TBA, MtBE, DIPE, TAME, ETBE, ethanol, methanol, 1,2 -DCA, EDB <br />M = Monthl <br />t7 = Quarterly, Quarterly samples = Jan, April, July, Nov. <br />3 Call site engineer before leaving site. <br />Completed By: Date: SECOR <br />Rwomiswiele,emce hequestAs <br />A� <br />kSVE;10f�uent f,=F ;SVE Efflurr& +' <br />TPHg/BTEX/MtBE <br />2x per Month 2x per Month <br />FID <br />2x er Month 2x er Month <br />Take bag samples on even dated Wednesdays <br />2 Sample GWE system (water samples) according to the following schedule <br />Check Appropriate Category <br />[x Budget Site Visit <br />[� Out of Budget Site Visit <br />Budget Hours: 2/4 <br />Actual Hours: <br />Mob/de Mob: 2 <br />Site Safety Concerns <br />See Health and Safety Plan <br />Analyze samples by 8280 for oxygenates TBA, MtBE, DIPE, TAME, ETBE, ethanol, methanol, 1,2 -DCA, EDB <br />M = Monthl <br />t7 = Quarterly, Quarterly samples = Jan, April, July, Nov. <br />3 Call site engineer before leaving site. <br />Completed By: Date: SECOR <br />Rwomiswiele,emce hequestAs <br />