Laserfiche WebLink
PART C: ABATEMENT EQUIPMENT DATA <br />CATALYTIC OXIDIZER Before Adjustment Final Ideal Ran e <br />Oxidizer Setpoint (°F) <br />Inlet Temperature (°F) <br />High Temp. Setpoint (°F) <br />Catalyst Temperature (°F) <br />Exhaust Temperature °F <br />PART D: GWE SYSTEM DATA <br />• <br />System up or down upon arrival: UP Effluent Totalizer Reading: 4 •-trip At time: <br />Hourmeter Readings EX -1 MW -13 MW-14/EX-2 EX -3 <br />S stem Data <br />Before Adjustment final Idea! Range <br />Bag Filter Inlet/Outiet Pressures(psi) <br />Z- <br />11 <br />1u Carbon Inlet/Outtet Pressure(psi) <br />2n4 Carbon Inlet/Outlet Pressure(psi) <br />3nd Carbon Inlet/Outlet Pressure (psi) <br />a I <br />METER Calibration Data Before Adjustment i Final Ideal Range <br />I I <br />LEL Readin %LEL <br />I i I <br />Field Instrument Used: Last Calibrated: <br />I <br />Totalizer Meter Calibration <br />Field Instrument Used: <br />PART E: TROUBLESHOOTING (complete If system was down upon arrival at site) <br />a. Give details of system status upon arrival <br />b. Give details of work performed to troubleshoot the problem <br />0 <br />