Laserfiche WebLink
COPY <br />GINC. <br />July 6, 2000 <br />Mr Marty Hartzell <br />California Regional Water Quality Control Boat <br />344; Routier Road, Suite A <br />Sacramento, California 95827 <br />Subject Schedule for Saniphng the Interim Groundwater Extraction and Treatment System and <br />Vapor Extraction S) stem at Former Chevron Station 49-5775, 301 West Kettlennan Lane, <br />Lodi, California <br />Mr Hartzell <br />As diSCUSSed at the subject site on July 3, 2000, )oil requested a schedule for sampling tine interim <br />Groundwater Extraction and Treatment System (GWETS) and the ETS aiipdrVES wereito bettein operation by <br />by <br />required by Cleanup and Abatement Order No 5-00-704 tine GWETS <br />July 3, 2000 On July 3, 2000, Mr Bob Cochran (Chevron Products Company), Mr Marty Hartzell <br />(California Regional Water Quality Control Board), Mr Harlin Knoll (San Joaquin County Public Health <br />• Services), Mr Gieg A Gurss (Gettler-Ryan Inc ) and other Gettler-Ryan Inc employees were present at 2 00 <br />pm to verify that the GWETS and VES were operational <br />Groundwater is extracted from well EX -i and pumped to a feed tank Water from the feed tank is then <br />pumped through three - 2,000 pound carbon vessels connected in series prior to discharge to the City's <br />industrial waste line As discussed, the initial sampling of tile GWETS is scheduled for July 5, 2000 at 10 00 <br />am The City of Lodi, Department of Public Works will have a representative onsite to witness tills sampinlg <br />event Samples will be collected from the influent (prior to tine 1" carbon vessel), after the land 2"d carbon <br />vessels, and the effluent (after the 3" carbon vessel) The water samples will be analyzed for total petroleum <br />hydrocarbons as gasoline (TPHg) and benzene, toluene, ethylbenzene, and total xylenes (BTEX) and <br />methanol by metliod 8015in/8020, TBA, DIPE, TAME, ETRE, MtBE, EDB, 1,2 -DCA, and ethanol by <br />method 8260 The GWETS will be sampled weekly on each Wednesday at 10 00 air for the next 2 months <br />Samphng frequency after the initial 2 months may be altered depending on analytical results and <br />authorization from the City of Lodi <br />The VES consists of a catox with a blower which is currently extracting soil vapor from the four onsite vapor <br />extraction wells VWI through VW4 We are scheduled to have the San Joaquin Unified Air Pollution <br />Control District inspection on Monday, July 10, 2000 at 10 00 am Per the Authority to Construct, influent <br />and effluent vapor samples will be collected and analyzed for TPHg/BTEX/MtBE by method 8015m/8020 <br />The VES will be monitored twice a month with influent and effluent samples collected monthly The <br />samples will be collected during the third week of each month <br />0 <br />346408 09 <br />Cl i -9577i Rtn]Ldl-11 SamPLn". SCh <br />6747 Sierra Court, Suite J 9 Dublin, California 94568 (925) 551-7555 <br />