Laserfiche WebLink
. SVE/GWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />Date <br />Time of Arrival �� �� <br />Technician Steve Thompson Time of Departure <br />Site Engineer David M Evans Was Site Engineer contacted from fields Yes _,,v No <br />PART A GENERAL INFORMATION <br />Site Location Chevron 95775, 301 West Kettleman Lane Lodi CA <br />Abatement Equip Falmouth Products Falco 100 Catalytic Oxidizer <br />SVE Blower 5 hp motor, 15 5 Am <br />Telemetry <br />Electrical Power _230 V 3 phase - 200 amp <br />Supplemental Fuel None <br />No of K10 barrels at site �!/ Full Empty <br />PART B SVE SYSTEM DATA <br />Project No 077 43452 550 <br />Senal No <br />Max AMP Rating 15 <br />MAX AMP Rating <br />Elect Meter Reading :�-3 F 3a <br />System up or down upon arrival (If down please complete PART E) <br />. Hourmeter Reading At time <br />n <br />7 <br />01 <br />Flow Data <br />Before Ad ustment <br />After 80ustment <br />Final <br />% Diilubon au valve oppen <br />.3<9 <br />CQOS-t� <br />% Recirculation valve open <br />`r <br />��-- <br />K10 Content <br />o ! <br />3 7 '^ <br />Vacuum 0 blower (m H20)/i <br />_ <br />Gauge Bange <br />r <br />AMPS drawn by blower motor AMPS <br />! - y <br />Total SysWn How (e P, in Filo) <br />w <br />I !, G <br />` `77. <br />�I <br />Well Field Air Flow (e P. in H2O) <br />PWeSize 4' <br />Q cS 1 <br />/ z) <br />Dfludon Air Flow (e P. 'H2O) <br />P Size <br /># <br />FID Data <br />W/ Carbon <br />W/O Carbon <br />Difference <br />ftstm Influent before ddution <br />.3<9 <br />S em Influent after dilution <br />`r <br />��-- <br />ISystem Effluent <br />— <br />3 7 '^ <br />Field Instrument Used Last Calibrated <br />