Laserfiche WebLink
11 <br />Date <br />Technician Steve Thompson <br />Site Engineer David M Evans <br />PART A GENERAL_ INFORMATION <br />SVE/GWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />Time of Arrival <br />Time of Departure <br />c3' 2-9 <br />�U <br />Was Site Engineer contacted from field? Yes >e- No <br />Site Location Chevron 95775._301 West Kettleman Lane, Lodi CA <br />Abatement Equip <br />Falmouth Products Falco 100 Catalytic Oxidizer <br />SVE Blower 5 hp <br />motor, 15 5 Amp <br />Telemetry <br />S" " �f � / <br />Electrical Power <br />230 V 3 phase - 200 amp <br />Supplemental Fuel None �! <br />No of K/O barrels at site 12 -Full' e// Empty <br />PART B SVE SYSTEM DATA <br />1) <br />11) <br />• <br />Project No 077 43452 550 <br />Serial No <br />Max AMP Rating �S S <br />MAX AMP Rating <br />Eject Meter Reading ; ,5 7Z!_ - <br />System up or down upon arrival (If down please complete PART E) <br />Hourmeter Reading G 3,57,„.E At time ' <br />Flow Data <br />Before Adjustment <br />After Mustment <br />Final <br />% Dilution air valve open <br />% RecirWation valve o <br />%d <br />WO Content <br />J <br />7 - <br />cuum 0 glower (in H2O) <br />Ga Ra <br />7 � <br />� <br />drawn blower motor AMPS <br />Gotal <br />System Flow (A P. in H2O) <br />Pme Size 4.!_ <br />Welt Field Air Flow ( A P, in H2O) <br />P Size 4” <br />IDdution Air Flow ( A P, "H2O) <br />Poe Size 6j� <br />FID Data <br />W/ Carbon <br />W/O Carbon <br />Differen e <br />System Influent before dilution <br />System Influent v after dilution <br />Svstem Effluent v <br />J <br />7 - <br />Fieid Instrument Used Last Calibrated , <br />