Laserfiche WebLink
• <br />Date <br />Technician Steve Thompson <br />Site Engineer David M Evans <br />PART A GENERAL INFORMATION <br />SVE/GWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />Time of Arrival <br />Time of Departure / <br />Was Site Engineer contacted from field 7 Yes X _No <br />Site Location Chevron 95775, 301 West Kettleman Lane, Lodi, CA <br />Abatement Equip Falmouth Products Falco 100 Catalytic Oxidizer <br />SVE Blower 5 hp mottor, 15 5 Am <br />Telemetry <br />Electrical Power 230 V 3 phase - 200 amp <br />Supplemental Fuel <br />No of K/O barrels at site --37 Full Empty <br />PART B SVE SYSTEM DATA <br />is <br />Project No 077 43452 550 <br />Serial No <br />Max AMP Rating <br />MAX AMP Rating <br />Elect Meter Reading`� 5 71 <br />System up or down upon arrival (If down please complete PART E) <br />Hourmeter Reading _� ?S f At time <br />Flow Data <br />Before Adjustment <br />After Adjustment <br />Final <br />% Dilution air valve c pen <br />% Recirculation valve open <br />Q <br />_� <br />K/O Content l <br />Vacuum @blower (in H2O) <br />nge <br />AMPS drawn blower motor AMPS <br />Total System Flow (A P. in H20) <br />Pipe Size # <br />; <br />/�•� �� <br />Well Field Air Flow (A P in H2O) <br />Pipe Size# VP <br />Dilution Air s=low (A P 'H2O) <br />Pipe Size 4" <br />FID Data <br />W/ Carbon <br />W/O Carbon <br />Chfterence <br />System Influent v before dilution <br />System Influent Jepmv after dduLon <br />_� <br />System Effluent my <br />�r <br />Field Instrument Used Last Calibrated <br />