Laserfiche WebLink
07/14100 FRI 17 08 FAX 1 916 861_0430 SECOR-SACRAMENTO X002 <br />Date July 14, 2000 SECOR <br />. tate wfional incorporated <br />CHEVRON QUARTERLY PROGRESS REPORT <br />Primary Agencies Marty }Iarhtell <br />RWQCB-CVR <br />3443 Routter Road, Suite A <br />Sacramento, CA 95327-N98 <br />Facilhy No 9-5775 Address <br />CHEVRON Project Manager <br />Consulting Co lContact Person <br />Consultant Project No <br />Assembly Bill 691 Slates <br />Karim Knoll <br />San Jongnm County Environmental Health <br />Division <br />304 E. Weber Avenue, 3rd Floor <br />Stockton, CA 95202-2708 <br />341 West KettlMan Lane, fie, California <br />Robert Cochran <br />SECOR Internaiaonai, Iris. — Roger Hotimore <br />077 41991 M3 <br />prpperty Owners, Ives and Roger Baffoel <br />WORK PERFORMED SECOND QVARTER 2400: <br />• 1 Conducted quarterly groundwater monitaring and sampling <br />2 Installed Groundwater Extrsction / Soil Vapor Extraction SYsttm <br />WORK PERFORMED r PROPOSED THM QUARTER 2000: <br />1 Prepared and submitted seeatd quarter groundwater mnnftoring and remedial syswn evaluation report <br />2 Remedial system start up (07103100) <br />1rtstalled monitoring wells MW -5B, MW -88, MW -10A, MW -10B, MW -1 f A, MW -I 1B, MW -12A, NiW-12B, <br />3 MW -1.3 and mW -14 (completed 07107(00) <br />4 Conduct quarterly groundwater monitoring and sampiurg <br />5 Operation and maintenance of groundwater extraction / soil vapor eximctlon system <br />b prepare and submit Problem AQseaament Report (PAR) <br />7 prepare and submit Final Remediation Plan (FRP)- <br />0 r n C-4 aide Jffi �Y(i1 04(A djvb 16f M]0 fav �f91t1� <<�rur cU►�r <br />;013 f,+ff+iift+ 1[ijcul lrrrlc f(X1 Nlt�rc7�u GrnYl K" <br />