My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003080
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 10:25:48 AM
Creation date
10/10/2018 9:32:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003080
FileName_PostFix
XR0003080
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 28, 2000 <br />Project 077 41991 500 <br />Mr Harlin Knoll <br />Mr Marty Hartzell <br />SECOR <br />International Incorporated <br />San Joaquin County Environmental Health RWQCB-Central Valley Region <br />Division 3443 Routier Road, Suite A <br />304 East Weber Avenue, Third Floor Sacramento, CA 95827-3098 <br />Stockton, CA 95201-0388 <br />RE Addendum to April 27, 2000 Work Plan <br />for Remedial Well Installation and Additional Site Assessment <br />(Cleanup and Abatement Order No 5-00-704) <br />Former Chevron 99-5775 <br />301 West Kettleman Lane <br />Lodi, California <br />Dear Mr Knoll and Mr Hartzell <br />. This letter, prepared by SECOR International incorporated (SECOR) on behalf of <br />Chevron Products Company, presents an addendum to Gettler-Ryan's Work Plan for <br />Monitoring Well Installation, dated April 7, 2000, at the subject Site (Figure 1) This <br />addendum to the Work Plan outlines additional proposed treatment necessary to further <br />confine the dissolved hydrocarbon plume previously reported at the Site Remedial <br />wells installed under the Remedial Well Installation and Additional Site Assessment <br />Work Plan Addendum, dated April 27, 2000, will be used for implementing an Oxygen <br />Diffusion treatment system along the southern and southwestern edges of the Site <br />Gettler-Ryan's Work Plan proposed the drilling and installation of six groundwater <br />monitoring wells (Figure 2) Groundwater contour maps for December 3, 1999 and <br />March 1, 2000 indicate that groundwater flows to the east-southeast and southeast, <br />respectively Eight 4 -inch wells have been proposed in the April 27, 2000 addendum to <br />be installed on the south and southwestern edge of the property for the implementation <br />of an oxygen diffusion treatment system This addendum outlines the proposed oxygen <br />diffusion treatment for the Site <br />OVERVIEW OF OXYGEN DIFFUSION TREATMENT <br />The treatment is the application of a patented method developed at the University of <br />Waterloo by Drs D Mackay and R Wilson, that uses oxygen diffusion to increase <br />biological activity and the biodegradation of TPH, BTEX, and MtBE in groundwater It <br />works as an in -well remediation system that forms an oxygen diffusion halo around the <br />9912 Bus1aaess Park Dnee, Mite 100, Sacramento CA 95827 (916) 364-1880 (916)364-1,",9 Fax rune It ,ceoa com <br />
The URL can be used to link to this page
Your browser does not support the video tag.