Laserfiche WebLink
I� <br />CLEANUP AND ABATEMENT 0RDER NO. 5-00-704 <br />FORMER CHEVRON STATION #9-5775 <br />301. WEST KETTLEMAN LANE <br />LODI, SAN JOAQUIN COUNTy <br />Site -Specific Investigation and Cleanup Tasks (continued) <br />Com liance Date <br />3. Install and continuously operate a soil vapor extraction system, and an <br />- interim pump and treat system in the area of the highest <br />3 July 2000 <br />soil and <br />groundwater MtBE contamination. The interim pump and treat <br />sYstem must stabilize the groundwater plume to prevent movement <br />of AUBE toward City Well 12. <br />4. Submit a complete Problem Assessment Report (PAR) acceptable to the, <br />Board and County staff, as described <br />24 July 2000 <br />m Appendix A of the Tri -Regional <br />Recoiiumend ations. The PAR must include requirements <br />for any <br />discharge permit(s) required and a time line for submittal of <br />Waste Discharge. Report(s) of <br />�R <br />Within I5'days of Board staff approval of the m Assessment <br />Report, but no later than 28 August 2000, submit aFi al Remediation <br />Plan (described in Appendix A) for <br />28 August 2000 <br />the cleanup of the soil and <br />groundwater at the site. <br />6. Within 30 days of Board staff approval of the selects d Remedial Option, <br />but no later than 6 October 2000, implement <br />6 October 2000 <br />and continuously operate, <br />the approved remediation system, with the exception of periodic and <br />scheduled maintenance. Any interruption in the operation of the <br />cleanup system(s), other than for scheduled maintenance, without prior <br />approval of the Executive Officer, is <br />a violation of this Order. <br />Reporting and Permits <br />7. Notify the Board and County staff at Ieast two business days prior to any site work or sampling. <br />8.' Obtain all necessary local and state permits prior to beginning work. <br />9. Submit all reports and correspondence to the Board's Sacramento Office, the San Joaquin <br />County Environmental Health Division, and all parties (or representatives) identified in this <br />Order. Under penalty of perjury, the technical reports as directed, which shall be submitted to the <br />Executive Officer of the Board, and to the County, must be signed by an appropriately licensed <br />Professional (technical reports and plans, including <br />groundwar <br />sampling, are to be prepared, signed, and certified by alRegistteered Geologisling logs and soil t Regis e ed Civil <br />Engineer, Certified Engineering Geologist, or Certified Hydrogeologist). All registered <br />professionals must be licensed by the State of Califo-nia. <br />10. Submit preapprovals with workplans and all reports --vith reimbursement requests to the State <br />Water Resources Control Board Cleanup Fund in a timely manner to avoid delays that would <br />result in non-compliance with this Order. <br />4 <br />