Laserfiche WebLink
r <br />i <br />SVE/GWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />Date: ZD <br />-b <br />Technician: Steve ThompaDn—i2AU G! <br />Site Engineer: - Karam Parmar <br />PART A: GENERAL INFORMATION <br />Time of Arrival: <br />Time of Departure: <br />Time Slid Engineer was contacted from field? <br />Site Location: Chevron 9-5775 301 West Met leman Lane Lo i CA <br />Abatement Equip : Falmou h Products 1= Ico 100 Catal2tic O Id i r <br />SVE Blower: 5 motor, 15.5 Am <br />Telemetry: Sonitrof <br />Electrical Power: 230 V 3 phase - 2o0 a <br />Supplemental Fuel: None <br />No. of K/O barrels at site: O <br />—Full Empty <br />PART B: SVE SYSTEM DATA <br />Project No. 77CH.95775,02.0550 <br />Serial No,: <br />AMP Reading: <br />MAX AMP Rating: <br />Elect. Meter Beading: ! S-1 <br />System up or down upon arrival: U P (!f down please complete PART E) <br />Houmteter Reading: _ _ _._ At time: y f <br />rPrtehourmeter reading <br />23 35�. <br />ourmeter reading <br />adinminus previous reading26 <br />s since fast O&M event <br />0 % 000rabitity <br />D� <br />C.Zocuments and Settltr slGa Cllft\L <br />Q ry ocai SettingslTemporary Internet FlIes10LK9110MDATA Sheeti.doc <br />site <br />