My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012859
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0012859
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 10:32:35 AM
Creation date
10/10/2018 10:06:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0012859
FileName_PostFix
XR0012859
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Robert Cochran <br />Chevron Environmental Management Company _ 2 12 August 2003 <br />shut down the S VE system, due to asymptotic levels of treated contaminants and lack of rebo <br />SVE system shutdown. and after <br />2) I recommend that Chevron conduct computer mo <br />groundwater, to determine the pumping rate necessary lto maintain hydring of the a remaining <br />oontrol aant mass t soil and <br />City of Lodi Municipal Well #12 (Well #12), 420 feet southwest of extraction well EX- protect <br />should consider various pumping rates (including no pumping) and locations. If i 2. The modeling <br />modeling show no impact to Well #12, then the GWE system may also be shut down and groundwater <br />3) Groundwater monitoringwill con <br />tinue after During the GWE rebound test, all monitoring ells will GWE sbe sampled quarterly detertern shutdown, to n'ne !f rebound occurs. <br />t least one h <br />cycle (one year). If little or no rebound occurs, then Chevron may submit a site closure re ort. ydrologic <br />p <br />4) Quarterly groundwater monitoring is required by Regional Board Cleanup and Abatement Order <br />k No. 5-00-704. After the soil/groundwater modeling and GWE system rebound testCo <br />} been conducted and the report(s) have been reviewed by Regional Board staff, I recommend nt 2) have <br />reconsidering Chevron's request to reduce groundwater monitoring, or consider a request for No Further <br />Action Required at the site. <br />5) The California Registered Geologist listed on the signature <br />by the California Business and Professions Code. Submittal of are v ed si sign the Report, as required <br />California licensed professional engineer or geologist with license number/seal is necessary.ture page by a <br />r(7 necessary. <br />F1, <br />
The URL can be used to link to this page
Your browser does not support the video tag.