Laserfiche WebLink
E L01 <br />FEB 2 5 2016 <br />------ M F_ low SAT <br />ON TUE MD THUR <br />SUN <br />ITEM tNV,1HUNMt1Y IAL <br />D D 44. 0 0 D <br />V&' <br />t4w <br />_ja.,Nl <br />FU <br />Leaks -Check all pumps for dr1p,, leaks or dama_qe —AcAiCIJ— <br />Vibration - Listen for vibrations ealg-uld 11f sJU I= leiluZ (ex niounft, Incorrect alignment) <br />jb= <br />Abnormal Nolse -Listen for abnormal noises that could be a sign of impending failure (bearfngs grinding, pump <br />sounds like rocks are in it) <br />Lubrication -Check oiler or sight Wass for proper oil level. Ensure oil is dear, not extremely Curly or foamy <br />PumplMotor Coupler - Visuallyinsped the couplerforsigns ofdamage- took for 'shavings'thet would indicate <br />Impending failure. Ensure safeguard is in place to prevent entanglement in rotating shaft. Viet.. <br />i. <br />offlOn Switches - Ensure each switch Is in the correct position, locked if required and clearly marked as to what <br />It operates. <br />Valve Position - Ensure valves amin the correct position, locked and/or sealed as required and cfearty marked <br />with a tag with its P41D 0 or its purpose <br />Containment Area - Ensure area Is clearaffeaves and debtfs, Inspect forsigns of damage <br />Line ShocktPIpeVibratlon -Watch and listen for vibration, which could be a sign of incorrectly sized piping, <br />pumps, pressure relief valves. etc <br />V <br />Pressure Relief Valves - Ensure valves are marked clearly with P&ID 0 and/or what it operates Look for drips, <br />leaks and sign of damage. <br />[Y <br />Tags 1 Decals - Ensure all pumps an- marked with eir a tag describing lhelrtuncUonorsomemeanso <br />identification. <br />L/ <br />Pressure Gauges -Record pressure gauges when gauges are present. Ensure the gauge Is t,hthln operating <br />guidelines for your system <br />ITOS, secdbnYXTiWrsj <br />Ethano1 F-251 report differential pressure and operating pressure once a day <br />—1 <br />%4 <br />11% <br />Supreme F-251report differential pressure and operating pressure once per day <br />Reg Unleaded F -1A report differential pressure and operating pressure <br />Reg Unleaded F -IB report differential pressure once per day <br />�C- <br />Diesel F-20 report differential pressure and operating pressure <br />Diesel F-2-1 report differential pressure and operating pressure <br />Leaks - Look forleaks near seems, welds, fittings and valves. <br />1/ <br />1.-- <br />Containment Area - Ensure area is clear of leaves and debris, inspect for signs of damage <br />Valve Position - Ensure valves are In the toted position and locked orsealed when required. Ensure all <br />connection points are plugged- <br />- <br />✓✓ <br />V'r <br />Pressure, Differential Gauges - Record gauge (M-11LE LOADING IS TAKING PLACE ON ALL RISERS FOR <br />L <br />THATPRODUC7) on appropriate form. Make sure gauge is not damaged and Is working correctly., <br />vo- <br />7"1 <br />_7 <br />Pressure Relief Valve -Look for drips. leaks and signs ofdamage. <br />Seals and Locks -Ensum all seals and locks are in place and show no signs of tampering <br />Togs/Decals -Ensure all filter vessels am marked with their P&tD #,a tag describing their function or some <br />means of identification. (Refer to API 1637 for Marking Labeling) <br />stilasipimfform -Ensum stiles and platform are sturdy; no signs of rust <br />Valve Position - Ensure valves are in the cormdposition (open/dosed) and locked ifrequired <br />JDrainintake <br />- Ensure drain Is clear of debris that could inhibit flow or cause clogging <br />i5- <br />1 )lq 0._, t g t_rtrw Ivo I -F 0—lr-4-4­'4 1-Y Qw <br />