Laserfiche WebLink
r <br />VAPOR RECOVERY UN(r-(VBU) /VAPOR COMBUSTION".U91'T ()ICU) <br />FEB 2 5 2016 <br />ENWROWMEWAL- <br />WPAITU rlwmlmm-rill <br />ll TUE <br />WED <br />THUR <br />FRI <br />SAT SUN ticnxtXt <br />D N DLD N D <br />N <br />OS0 <br />'VRU - Visual y <br />Inspect for leaks excestive ar unusual noises, take daily readings, check level in vapor knockout <br />tank <br />I <br />LESS THAN 1E <br />TT INLET VAPOR PRESSURE <br />carbon Bed Temperatures/ Vessel #I Top <br />Carbon Bed Tempraturill Vessel 1 Bottan <br />Bed Temperatures/ Vessel #2 Top <br />_Carbon <br />Carbon Bed TemptraturesJ Vessel 02 Bottom <br />�i <br />Gasoline Temperature (Absorbent) <br />x <br />TI -701 (absorbent sup. ply) <br />Z <br />1OOF MAX <br />— <br />TI -302 ? absorbent froexch <br />VSCUUM PUMP seal fluid, tormperstures and flow <br />report <br />C-1 GPM <br />report <br />C-2 GPM <br />TI -401 Inlet <br />15F MAX <br />TI -402 Dischal #1 <br />report or check <br />—TI-40301sch2r,-e#2 <br />Sea i flu,d level Vace check mark 0 near center of site <br />V <br />V <br />repon or check <br />level (place check mark it near center o(site glass) <br />Gasoline clirculatlon pressures <br />10 PSIG MAX <br />PI -301 To absorber nozzle <br />17 PSIG MAX <br />PI -302 Lower absorber Nozzle <br />2"0 PSIG <br />PI - 701 P•1 Discharge <br />4410 <br />20-80 PSG <br />PI -501 P-2 Discharge <br />2a- RG <br />I Vacuum control trip point <br />-PI-50 <br />Record CEM Instant reading <br />iJ <br />Record CEM rolling PPM reading <br />.f <br />CEM data ul work .10 <br />An evidence -of -ca il m absorber ven <br />L <br />Any visible vapor at absorber vent? <br />-is <br />Aa- <br />Any vislb4e vapor at FIN valve? <br />Any I'll leaks? <br />Any unusual noise or vibrations? <br />Gas MxNen) <br />Span Gas (Propane) <br />Weekly Review: tri Date <br />erminal Manager Signature <br />■ <br />R, <br />