Laserfiche WebLink
`7 LZ LJ <br />FEB 2 5 2016 <br />N <br />E 12:V&D <br />1,A&Lz ENV, 3Q NTAL <br />PN- D <br />Fig <br />I D N <br />1 6 <br />D <br />M, <br />FA <br />��'J <br />Product Loading Moses Visually Inspect for wear, damage, corrasion, kinks, drips and leaks Ensure hoses <br />are clearly marked with riser number and product service <br />Dry Break Couplers - Visually inspect for damage, corrosion, proper orientation (observe hookup 10 vehicle dry <br />break) abnormal difps, leaks Ensure gaskets are in place and In good condition Ensure handles and pins are in <br />good condition <br />Product Hose Swivels - Look for drips and leaks- Make sure swivels move freely and easily <br />L✓ease <br />Countarwelghts - Visually Inspect the counterweight for damage orcorrosion, Move the loading arm end check <br />of movement and balance <br />Vapor Hoses - Visually Inspect for damage and vapor leaks. Ensure there is no product in the hose Make sure <br />gaskets am in place and are in good condition <br />Vapor Couplers Ensure gaskets are in place and in good condition Make sum plunger Is present to push in <br />poppet on tanker Make sure ears and pins are in good condition <br />Vapor Hose Swivel Joints - Visually inspect for damage, drips and leaks. Ensure swivelS Move freely and <br />easily, properoperation.AR, smooth Movement Of the [00CUng arm <br />Product/Vapor Valves & PipingtSupports - Visually inspect for drips and leaks, particularly atconnection poinis <br />and flanges Look for signs of damage andlor corrosion Ensure piping is Beady labeled with product service <br />and flow direction <br />✓I$- <br />Jr- <br />Turbine Meter - Visually inspect the turbine meter for leaking at flanges, proper operation (a g. metercount) <br />Control Valva - Visually inspect the control valve for damage, leaking of flanges, pmperoperadon controffect <br />opening and dosing <br />(X <br />Drain boxesipump off systemsibuckets - Ensure boxes and buckets are empty Make sure pump offsystem <br />hose and fillings are in good condition and gaskets are present and in good condition Ensure them are no air <br />A <br />leaks. <br />4- <br />Drains - Ensure all drains are door of debris that could Inhibit flow or cause dogging. <br />X <br />Locks and Seals -Ensure all locks and seats are in place on the meters, pre -amp housings and valves <br />Heat Sensors Ensure the sensors are present and show no obvious signs of damage <br />Emergency Shutdown (ESD) Ensure the ESD is clearly Identified and labeled and there are no obstructions <br />that would prevent access <br />Slgnaga - Ensure loading procedures and current version of the Product Loading Sequence Chart (PLSC) are <br />present and in good condition. <br />Lights - Ensure they are present and show no obvious signs of damage. Ensure they turn an and offal the <br />correct times to provide sufficient fighling <br />Canopy Rain Gutters - Ensure they are securely fastened and show no obvious signs of damage Make sure <br />the downspouts are not directing water Into areas that could cause InAlrY or equipment damage <br />Video Cameras Ensure they are present and show no obvious signs of damage Chock manila inside to <br />ensure they are working property are in focus and are adjusted to provide maximum viewing. <br />Intercoms - Ensure they are present and show no obvious signs of damage. <br />Eye Wash Stations - Ensure eye wash slatrons are dearly identified and labeled and theta are no obstructions <br />that would prevent access <br />Emergency Shower - Ensure showeris clearly idendfied and labeled and them are no obstructions that would <br />prevent access <br />Deeco Screens - Ensure the screen Is on and legible end shows no signs of damage. Ensure enclosure is <br />rocked <br />fan printers. ensure RA CS <br />BOL Room -Ensure cleanliness, verifyprinter paper available for BOL and Pumey <br />cabinet is locked <br />I A!, <br />Housekeeping - Pick up off trash and dahn's, Empty trash cans. <br />