Laserfiche WebLink
FEB 2,5 2016 <br />i' -Z,4 _."' I <br />T_ <br />--VON _T_ TUE <br />MD <br />TH UR M <br />UT!_- �SUNT <br />ITEM <br />D N 0 N <br />Product Loading Hoses - Visually inspect for wear, damage, corrosion, kinks, drips and leaks Ensure hoses <br />are dearly marked wish riser number and product service <br />Dry Break Couplers - Visuaftyinspect fordamage. corrosion, proper orientation (observe hookup to vehicle dry <br />break), abnormal drips. leaks. Ensure gaskets are In place and In good condition. Ensure haridies and pins are in <br />good condition <br />Product Hose Swivels - Look for drips and leaks. Make sure swivels move freely and easily <br />Counterweights - Visually inspect the counterweight for damage or corrosion, Move the loading arm and check <br />ease of movement and balance <br />✓ <br />Vapor Hoses - 0sually Inspect for damage and vapor leaks. Ensure there is no product in the hose Make sure <br />gaskets are in place and am In good condition <br />Vapor Couplers - Ensure gaskets are In place Win good condition Make sure plungeris present to push in <br />poppet on tanker Make sure ears and pins are in good condition <br />Vapor Hose Swivel Joints - Visually Inspect for damage, drips and leaks. Ensure swivels move freely and <br />easily, proper operation. full, smooth movement of the loading arm <br />Valves & Plping/Supports - Visually Inspect for drips and leaks, particularly at connection points <br />and flanges Look for signs of damage ancVarcomision- Ensure piping is clearly labeled with product service <br />and flow direction <br />Turbine Meter - Visually Inspect the turbine meter farleaking at flanges, proper operation (a g. meter count) <br />L/f%PmductN"r <br />L/✓ <br />Contml Valve - Visually inspect the control valve for damage, leaking of flanges, proper operation controlled <br />opening and dosing <br />Drain boxesIpump ott systemstbuckets - Ensure boxes and bucket$ are empty Make sure pump off system <br />hose and fittings are in good condition and gaskets are present and in good condition Ensure there are no air <br />leaks <br />ly <br />Drains - Ensure all drains are clear oi'debris that could inhibit flow or cause dogging <br />Lochs and Seals - Ensure a9locks and seals are in place on the meters, pre -amp housings and Valves <br />Heat Sensors - Ensure the sensors am present and show no obvious signs of damage <br />Emergency Shutdown (ESD) -Ensure the ESD Is cteadyidenbfied and labeled and them are no obstructions <br />Mat would prevent access <br />7 <br />Signage - Ensure loading procedures and current version of the Product Loading Sequence Chart (PLSC) am <br />present and in good condition <br />Lights -Ensure they are present and show no obvious signs of damage. Ensure they turn on and offal the <br />correct times to provide sufficient lighting <br />Canopy Rain Gutters - Ensure they are securely fastened and show no Obvious signs ofdamage. Make sure <br />the downspouts are not directing water into areas that could cause Injury or equipment damage <br />Video Cameras - Ensure they are present and show no obvious signs ofdamage. Check monitorinside to <br />ensure they are working properly. are In focus and are adjusted to provide maximum viewing <br />Intercoms - Ensure they are present and show no obvious signs of damage. <br />✓ <br />V" <br />✓✓Eye <br />Wash Stations - Ensure eye wash stations are clearly identified and labeled and there are no obstructions <br />the t would prevent access <br />Emergency Shower -Ensure shower is clearly identified and labeled and them are no obstructions that would <br />prevent access <br />✓ <br />W— <br />Deeco Srmans - Ensure the screen Is an and legible and shows no signs of damage. Ensure enclosure is <br />locked <br />SOL Room - Ensure cleanliness verity printer paper available forBOL and journey plan printers, ensure RACS <br />cabinet is locked <br />I - Pick up all trash and debris Empty trash cans. <br />