My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2800 - Aboveground Petroleum Storage Program
>
PR0515878
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 4:51:46 PM
Creation date
10/10/2018 1:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515878
PE
2834
FACILITY_ID
FA0003821
FACILITY_NAME
CHEVRON PRODUCTS COMPANY #1001621
STREET_NUMBER
22888
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
22888 S KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RF E I V E D <br />San Joaquin County FEB 2 5 2016 <br />Environmental Health Department LI: �5-1��'] <br />1868 East Hazelton Avenue, Stockton, California- <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web:M'",4,NTAL <br />Aboveground Petroleum Storage Act Inspection Report <br />Facility Name: <br />CHEVRON PRODUCTS COMPANY #1001621 J <br />Facility Phone: <br />(209) 830-2430 <br />Date: <br />January 14, 2016 <br />Facility Address: <br />22888 S KASSON RD, TRACY, CA 95376 <br />CERS ID: <br />10153927 <br />Inspection Contact: <br />Sherman Saulog <br />Title: <br />Terminal Operator <br />Phone: <br />(209) 830-2430 <br />Inspection Type: <br />ROUTINE INSPECTION - Operating Permit <br />I Program: <br />12834 - AST FAC I M + I - <1=10 M GAL CUMULATIVE <br />Consent For: <br />Z Insizection 0 Photos N Samples <br />I Consent Given By. <br />I Sherman Saulog, Terminal Operator <br />CCR =Cali forma Code of Regulations H5G = Health and bately Code CFR =Code of Federal Regulations <br />V=Violation R =Repeat violation COS =Corrected onsite during inspection <br />Aboveground Petroleum Storage Act <br />101 <br />1 HSC 25270.4.5(a) <br />Failed to prepare and implement a written SPCC Plan in accordance with CFR Part 112 <br />:1 V o R � COS <br />102 <br />HSC 25270.4.5(a) <br />Failed to properly close a tank that is considered permanently closed <br />n o R o COS <br />103 <br />HSC 25270,6(a) <br />Failed to file Business Plan or annual facility tank statement if capacity is over 10,000 gallons <br />o V u R Li COS <br />104 <br />HSC 25270.6(b) <br />Failed to submit APSA fees <br />o V o R o COS <br />105 <br />HSC 25270.8 <br />Failed to report spills or releases of 42 gallons (one barrel) or more <br />n V o R o COS <br />106 <br />CCR 25185(c)(3) <br />Failed to submit a written response within 30 days of receiving an inspection report <br />o V o R u COS <br />107 <br />!HSC 25404(e)(4) <br />Failed to report program data electronically <br />ri V L! R o COS <br />Requirement to Prepare and Implement a SPCC Plan <br />201 <br />CFR 112.3(4) <br />Plan certification by a Professional Engineer (PE) missing or incomplete <br />u V o R Lj COS <br />202 <br />CFR 112,3(e)(1) <br />Failed to maintain a copy of the Plan on site <br />n V o R o COS <br />Amendment of SPCC Plan by Owners or Operators <br />301 <br />CFR 112.5(a) <br />Failed to amend Plan as necessary <br />DV o R o COS <br />302 <br />CFR 112.5(b) <br />Failed to review Plan once every five years and/or implement any resulting amendments <br />n V o R o COS <br />303 <br />CFR 112.5(c) <br />Failed to have a PE certify technical amendments <br />i � V -, R i -I COS <br />General Requirements for SPCC Plans <br />601 <br />CFR 112.7 <br />Plan that does not follow the sequence specified in this section lacks a cross-referencing section <br />L3 V Fi R n COS <br />602 <br />CFR 112.7 <br />Plan lacks approval of management to fully commit the necessary resources to implement the Plan <br />o V n R u COS <br />603 <br />CFR 112-7(a)(2) <br />Plan failed to discuss equivalent environmental protection, if applicable <br />o V n R o COS <br />604 <br />CFR 112.7(a)(3) <br />No facility diagram or didn't show location and contents of containers, transfer stations, and pipes <br />n V ri R o COS <br />605 <br />CFR 112.7(a)(3) <br />Plan failed to address facility layout, operations discharge prevention methods and containers <br />o V Li R u COS <br />606 <br />CFR 112.7(a)(4) <br />Plan failed to contain procedures for reporting a discharge <br />o V o R o COS <br />607 <br />GFR 112.7(a)(5) <br />Discharge procedures are not adequately addressed if the facility has no response plan <br />o V ri R u COS <br />608 <br />CFR 112.7(b) <br />Plan failed to include a description of potential equipment failure or provide equivalence <br />n o R o COS <br />609 <br />CFR 112.7(c) <br />Failed to provide secondary containment, diversionary structures, or equipment to prevent discharge <br />a V u R c3 COS <br />610 <br />CFR 112.7(d) <br />Full or partial PE certified Plan failed to explain impracticability <br />o V u R o COS <br />611 <br />CFR 112.7(d)(1) <br />Full or partial PE certified Plan failed to include spill contingency if no response plan submitted <br />r3 V n R o COS <br />612 <br />CFR 112.7(d)(2) <br />No written commitment of manpower, equipment, and materials to control and remove oil discharge <br />oV u R o COS <br />Re—ce"WeN4 <br />(initial)- <br />� I <br />61 <br />1 <br />I Inspector: <br />ARTS VELOSO, Senior REHS <br />Phone: <br />(209) 468-3453 <br />Date: <br />01/14/2016 <br />Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.