My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PETERSEN
>
3663
>
2800 - Aboveground Petroleum Storage Program
>
PR0517463
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 11:41:08 AM
Creation date
10/10/2018 4:21:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0517463
PE
2832
FACILITY_ID
FA0010627
FACILITY_NAME
Penske Truck Leasing Co., LP
STREET_NUMBER
3663
STREET_NAME
PETERSEN
STREET_TYPE
Rd
City
Stockton
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
3663 Petersen Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PENSKE <br />April 16, 2015 <br />San Joaquin County <br />Environmental Health Department <br />Ms. Stacy Rivera, Senior REHS <br />1868 East Hazelton Avenue <br />Stockton, CA 95205-6232 <br />RE: Penske Truck Leasing Co., L.P. <br />3663 Petersen Road <br />Stockton, CA 95215 <br />CERS ID: 10174481 <br />Dear Ms. Rivera: <br />RV <br />APR 17 Zp�S <br />SMR RMITISERVICESLT� <br />PE <br />In response to the Aboveground Petroleum Storage Act Inspection Report dated 3/20/2015 for the above <br />referenced facility, Penske Truck Leasing has corrected the violations. Our responses to the violations are <br />as follows: <br />Item # 301 All references to Underground Storage Tanks have been removed from the SPCC Plan <br />(Reference attached SPCC Plan) <br />Item # 604 The facility diagram has been updated to show the changes made during the <br />reconstruction conducted in the summer of 2014. (Reference attached SPCC Plan) <br />Item # 605 The waste oil filters and oil/water separator sludge has been added to the SPCC Plan. <br />The diked darn area around the unloading fill area for the diesel tanks has been addressed <br />in the SPCC Plan. Coordinators and contacts have also been either added or updated in <br />the SPCC Plan. <br />Item #608 Potential equipment failure and the resulting spill for drums of waste oil and oil/water <br />separator sludge in the hazardous waste storage area has been addressed the SPCC Plan. <br />Item # 713 I have attached a copy of AST integrity test that was completed on 10/4/11 by Powers <br />Engineering & Inspection, Inc. (Reference attached STI SP001 AST Inspection Report) <br />Penske Truck Leasing Tel 610 775 6298 <br />Rt. 10 Green Hills, PO Box 7635 Fax 610 775 6442 <br />Reading, PA 19603-7635 gopenske.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.