My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PETERSEN
>
3663
>
2800 - Aboveground Petroleum Storage Program
>
PR0517463
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 11:41:08 AM
Creation date
10/10/2018 4:21:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0517463
PE
2832
FACILITY_ID
FA0010627
FACILITY_NAME
Penske Truck Leasing Co., LP
STREET_NUMBER
3663
STREET_NAME
PETERSEN
STREET_TYPE
Rd
City
Stockton
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
3663 Petersen Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br />Environmental Health Department APR 17 2015 <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd I. <br />Aboveground Petroleum Storage Act Inspection Rep -t <br />Facility Name: Facility Phone: Date: <br />F, nq Co LP 6 .; 498 Mn,r-h ?0 <br />CERS ID: <br />Facility Adclress: . <br />3 Stockton CA 9b;''"", <br />Inspection Contact: Title: Phone: <br />T ler Ha lett •in er ��9 942-2004 <br />Inspection Type: Program: <br />ROUTINE INSPECTION - Cieratin Permit HST FAC 10 K - </=100 K GAL CUMULATIVE <br />Consent For: Consent Given By: <br />Ins ection Photos Sarre lin Weir Ha lett branch Service Manager <br />CCR = CaRomis Code of Regulations HSC = Health and Safety Code CFR =Code of Federal Regulations <br />V = Violation R =Repeat violation cos =Corrected on site during inspection <br />Aboveground Petroleum Storage Act <br />101 <br />HSC 25270.4.5(a) <br />Failed to prepare and implement a written SPCC Plan in accordance with CFR Part 112 <br />o V o R ,COS <br />102 <br />HSC 25270.4.5(a) <br />Failed to properly dose a tank that is considered permanently closed <br />o V o R u COS <br />103 <br />HSC 25270.6(a) <br />Failed to file Business Plan or annual facility tank statement if capacity is over 10,000 gallons <br />o V o R o COS <br />104 <br />HSC 25270.6(b) <br />Failed to submit APSA fees <br />o V o R ❑ COS <br />105 <br />HSC 25270.8 <br />Failed to report spills or releases of 42 gallons (one barrel) or more <br />o V ❑ R ❑ COS <br />106 <br />CCR 25185(c)(3) <br />Failed to submit a written response within 30 days of receiving an inspection report <br />o V ❑ R o COS <br />107 <br />HSC 25404(e)(4) <br />Failed to report program data electronically <br />o V ❑ R o COS <br />Requirement to Prepare and Implement a SPCC Plan <br />201 <br />CFR 112.3(d) <br />Plan certification by a Professional Engineer (PE) missing or incomplete <br />o V a R ❑ COS <br />202 <br />CFR 112.3(e)(1) <br />Failed to maintain a copy of the Plan on site <br />n V r; R i : COS <br />Amendment of SPCC Plan by Owners or Operators <br />301 <br />CFR 112.5(a) <br />Failed to amend Plan as necessary <br />T. V ❑ R u COS <br />302 <br />CFR 112.5(b) <br />Failed to review Plan once every five years and/or implement any resulting amendments <br />o V o R o COS <br />303 <br />CFR 112.5(c) <br />Failed to have a PE certify technical amendments <br />o V o R o COS <br />General Requirements for SPCC Plans <br />601 <br />CFR 112.7 <br />Plan that does not follow the sequence specified in this section lacks a cross-referencing section <br />❑ V u R o COS <br />602 <br />CFR 112.7 <br />Plan lacks approval of management to fully commit the necessary resources to implement the Plan <br />n V o R o COS <br />603 <br />CFR 112.7(a)(2) <br />Plan failed to discuss equivalent environmental protection, if applicable <br />o V ❑ R o COS <br />604 <br />CFR 112.7(a)(3) <br />No facility diagram or didn't show location and contents of containers, transfer stations, and pipes <br />■ V n R ❑ COS <br />605 <br />CFR 112.7(a)(3) <br />Plan failed to address facility layout, operations discharge prevention methods and containers <br />■ V c R ❑ COS <br />606 <br />CFR 112.7(a)(4) <br />Plan failed to contain procedures for reporting a discharge <br />o V o R o COS <br />607 <br />CFR 112.7(a)(5) <br />Discharge procedures are not adequately addressed if the facility has no response plan <br />o V o R o COS <br />608 <br />CFR 112.7(b) <br />Plan failed to include a description of potential equipment failure or provide equivalence <br />■ V ❑ R ❑ COS <br />609 <br />CFR 112.7(c) <br />Failed to provide secondary containment, diversionary structures, or equipment to prevent discharge <br />o V c R ❑ COS <br />610 <br />CFR 112.7(d) <br />Full or partial PE certified Plan failed to explain impracticability <br />o V o R c COS <br />CFR 112.7(d)(1) <br />Full or partial PE certified Plan failed to include spill contingency if no response plan submitted <br />a V ❑ R ❑ COS <br />611 <br />CFR 112.7(d)(2) <br />No written commitment of manpower, equipment, and materials to control and remove oil discharge <br />o V o R o COS <br />612 <br />Reeelved by <br />(initial): <br />Inspector: r.n <br />TACY RIVERA, Senior REHS <br />Phone: <br />Date: <br />Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.