My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
2323
>
2800 - Aboveground Petroleum Storage Program
>
PR0528393
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 4:47:28 PM
Creation date
10/10/2018 4:36:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528393
PE
2832
FACILITY_ID
FA0009156
FACILITY_NAME
CALAMCO
STREET_NUMBER
2323
Direction
W
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
01
SITE_LOCATION
2323 W PORT RD G
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gwo <br /> WRION <br /> CFR 112.8(c)(8)(i-iv)Failed to provide each container with a high level monitoring <br /> device. <br /> r s rv � r No liquid level device was used on the tanks on site.At least one of the following <br /> devices must be installed in each containerMD 4 . <br /> Nigh iiquid level alarm with audible or visual signal <br /> High liquid level pump cutoff device set to stop flow at a predetermined content level <br /> Direct audible or code signal communication between the container gauger and the <br /> RN <br /> pumping station <br /> 'r x -Fast response system,such as digital computer,telepulse,or direct vision gauge.If a <br /> R IM `r' <br /> direct vision gauge is being used for determining the liquid level of each tank,a person <br /> must be present to monitor gauges and the overall filling of the tanks. <br /> In accordance with this section of the regulatory code, Immediately install an approved liquid level sensing device in accordance with CFR <br /> the facility utilizes direct vision gauges to determine 112.8 and implement necessary procedures to ensure that the devices are fully <br /> liquid levels in each tank Such gauges are monitored unctional and in use at all times during tank filling operations,or provide equivalence <br /> � r; � 6 <br /> during the time the are in use. Attach picture of s allowed b CFR 112.7(a}(2). <br /> r � x i iii r g Y P Y <br /> `?f� gauge. And put information into tank <br /> ✓f rfFaa rsi <br /> ri , FR 112.8(d)(4)Failed to regularly inspect aboveground valves,piping and <br /> appurtenances. <br /> v� y� sr �zx��4 g•tsusy {' n 'sAccording to Mr.Martin Jeppeson,the monthly inspections are conducted for the <br /> � fttaz' Valves,Piping&Appurtenances are checked every tanks and not the piping and associated parts_All aboveground valves,piping,and <br /> two hours during the Plantreading inspection. Please appurtenances shall be regularly inspected.Immediately inspect aboveground valves, <br /> see attached log sheets. In addition,new monthly pipingy and appurtenances and ensure inspections are done regularly,or provide <br /> re�xs �r ref Z 24 y inspection form includes a line item for above ground equivalence as allowed by CFR 112.7(a). <br /> gri srti? > bivalves,piping,and appurtenances. <br /> ��+'�� ��T,� �� �����x7� �:�� � e`��,�'�it��rrl,'iti`�'�"'�''� i' � � �3r ��� ��5!�i5a��+� ax�,tF�{Y'�kg':s ''�; �"�" a'�.L_•�*'Y!���•�i�,,rgs <br /> s,a.� r Y.,.E kw 1�1�+,,. k $ cv.@ '�}.^��"k�•h Jr §a 'JA A... . �x. .s. --:�. Sl. 4.: ,sf. .dr k_ b. ?a->st', <br />
The URL can be used to link to this page
Your browser does not support the video tag.