My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2800 - Aboveground Petroleum Storage Program
>
PR0529406
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2019 8:44:08 AM
Creation date
10/11/2018 1:40:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0529406
PE
2833
FACILITY_ID
FA0002818
FACILITY_NAME
UNION PACIFIC RAILROAD - STOCKTON
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
08801001
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANTEA GROUP Spill Prevention, Control,and Countermeasure Plan <br /> UPRR—Stockton, CA hard <br /> February 2016 <br /> PROFESSIONAL ENGINEER CERTIFICATION <br /> In accordance with 40 CFR Part 112.3(d),I hereby certify that: <br /> (i) I am familiar with the requirements of 40 CFR Part 112; <br /> (ii) I or my agent have visited and examined the facility on November 11,2015; <br /> (iii) The SPCC Plan has been prepared in accordance with good engineering practices, <br /> including consideration of applicable industry standards,and with the requirements of <br /> this part; <br /> (iv) That procedures for required inspections and testing have been established; <br /> (v) That the SPCC Plan is adequate for the facility;and <br /> (vi) That certain corrective action plan items have been recommended s facility in <br /> Section 2.0. <br /> 0 ....' <br /> � LIc� <br /> �,HDNYQ'Ls <br /> Professional Engineer: Gary A.Diewald, P.E. Q:} <br /> 4 210 <br /> P. E. Stamp, Signature,and Date: <br /> RECEIVED <br /> FEB 1 1 2016 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> v <br /> Antea Group Project No. UP0307-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.