Laserfiche WebLink
ANTEA GROUP Spill Prevention, Control,and Countermeasure Plan <br /> UPRR—Stockton, CA hard <br /> February 2016 <br /> PROFESSIONAL ENGINEER CERTIFICATION <br /> In accordance with 40 CFR Part 112.3(d),I hereby certify that: <br /> (i) I am familiar with the requirements of 40 CFR Part 112; <br /> (ii) I or my agent have visited and examined the facility on November 11,2015; <br /> (iii) The SPCC Plan has been prepared in accordance with good engineering practices, <br /> including consideration of applicable industry standards,and with the requirements of <br /> this part; <br /> (iv) That procedures for required inspections and testing have been established; <br /> (v) That the SPCC Plan is adequate for the facility;and <br /> (vi) That certain corrective action plan items have been recommended s facility in <br /> Section 2.0. <br /> 0 ....' <br /> � LIc� <br /> �,HDNYQ'Ls <br /> Professional Engineer: Gary A.Diewald, P.E. Q:} <br /> 4 210 <br /> P. E. Stamp, Signature,and Date: <br /> RECEIVED <br /> FEB 1 1 2016 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> v <br /> Antea Group Project No. UP0307-1 <br />