Laserfiche WebLink
Spill Prevention Compliance Corporation <br />Periodic Integrity rest CertificateRE , .. <br />P.O. Box 1289.. • • • "' Emaord, CA 95386 spccorpnhotmail.com one: 20 <br />Email: <br />----;--------------- --1th--------------------------------------------------------- ------------------- ----------- - ---- -� 10 2017 <br />Client: W. 11 St. Chevron -Contact: CJ Jutla, Operator <br />Address: 7501 11t St.. Phone No.: (209) 740-0347 <br />City/State/Zip; Tracy, CA 95304 Date of Test: 10-2-17 ENVIRONMENTAL HEAD' <br />Product Stored: New Oil DEPARTMENT <br />Tank Information (Brand/gallonage/Fuel Stored/UL or other serial#/miscellaneous) <br />Containment Solutions/650gals/New Oi /UL142/UL#S-682527/Double Wall Steel/4yrs old/11-2013 <br />Description of Secondary Containment Integral Secondary Containment <br />Date of Test 10-2-17 Test Supervisor(s) Todd McWhorter <br />METHOD OF PERIODIC INTEGRITY TEST -Primary XX Secondary XX <br />1. Steel Thickness Test (in accordance with API -653 and/or STI SP001 (5t" edition) -Readings Steel <br />Thickness UL 142 min. .123 in./Avg Steel thickness =.132 in. <br />2. Inert Gas Blanket <br />Gas Used: Nitrogen ; CO2: ; Other (specify) <br />Air Pressure -Test <br />Initial Reading (document <br />End Readings (document <br />Duration of Test: <br />Vacuum Test ; <br />psi/WC readings)_ <br />Time <br />psi/WC readings) Time <br />% drop <br />3. Sonar-Test_Y_N (document db readings) Duration <br />4. Camera(visual) model Lorex MC81845/interstitial (Result: P/F) Pass <br />5. Hydro -Carbon Sensor (probe) model OMNTEC BOA- (Result: P/F) Pass <br />6. Hydrology (Water Column) ( inches of water column readings) <br />Duration % Drop Results (P/F) <br />7. Other: Inspect Vessel & secondary containment. AST clearance is 2 inches above floor. <br />CRDM present, no evidence of leaking product from primary vessel, system was easily <br />accessible for inspection: No Product in secondary. Steel thickness measured in excess of <br />minimums required under UL 142. No evidence of leak. Tank is anchored: PASS <br />TEST RESULTS <br />1st -Stage: <br />Pass XX —Fail _ (quantify) SENSOR DETECTS NO PRODUCT, NOR LEAKS FROM <br />PRIMARY TANK INTO SECONDARY CONTAINMENT <br />2" -Stage: <br />Pass XX Fail_ (quantify) NO VISUAL EVIDENCE OF PRODUCT IN THE <br />SECONDARY & STEEL THICKNESS IN EXCESS OF MINIMUM UNDER UL 142 <br />STANDARD <br />Comments section Tank sits in Smo-e Test -Lube Room data on file <br />Next Scheduled Periodic Integrity Test <br />Date of Next Scheduled Test 10-2-22 <br />CZJ*ki4A` L IK// SPC Corp Representative <br />STI SP001 Certified Inspector No.: AST 135013 <br />