Laserfiche WebLink
Faeffity Employee Training Page 2 of 2 <br /> All facility employees have received the required on-the-job training within the past year. X <br /> All facility employees hired within the past 30 days have received the required on the job binning. x <br /> moaft leas eetioo;— <br /> Y N NA Date Done <br /> Monitoring system certification(within past 12 months) X 12-13-16 <br /> Spill Bucket testing completed(within past 12 months) X AST <br /> Leak Detector-mechanicaUelectronic for most'sites(within past 12 months) X 12-13-16 <br /> Ae above are usually done together on an annual basis for local regulator. <br /> Line Tightness(usually upon construction or when no positive shutdown) x <br /> Tank Tightness(Usually only after construction or when using SIR) g <br /> Secondary containment(SB989)tests have been completed(usually every 3 years) x AST <br /> Other testing or maintenance completed as required List them below <br /> Test/Maintenance:AQMD X 8-29-16 <br /> TesvMaintenanee: <br /> Test/Maintenance: <br /> PRINTOUT INCLUDED. Yes® No ❑ N.A,❑PRINTOUt'LEFT ON SITE:NBINDER UP TO DATE: <br /> Comments: NO ALARMS <br /> Eh'JlKOi' HEP, TH <br /> Items Requiring Follow-2R Actions;N/A <br /> Monthly inspection must be conducted by an ICC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator,but not to State Water Resources. <br /> Designator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that may require that may require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months.Records must be maintained on-site or,if approved by the local agency,off-site at a readily <br /> available location. <br /> 99/79 <br />