Laserfiche WebLink
Facility Employee Training Page 2 of 2 <br /> All facility employees have received the required on-the-job training within the past year. X <br /> All facility employees hired within the past 30 days have received the required on the job traiaiag. X <br /> Mom Ins 'om <br /> Y N NA Date Done <br /> Monitoring system certification(within past 12 months) X 12-13-16 <br /> Spill Bucket testing completed(within past 12 months) X AST <br /> Leak Detector-mechanicaUeleetronic for most sites(within past 12 months) X 12-13-16 <br /> The above are usually done together on an annual basis for local regulator. <br /> Lime Tightness(usually upon construction or when no positive shutdown) X <br /> Tank Tightness(Usually only after construction or when,using SIR) X <br /> Secondary containment(SB989)tests have been completed(usually every 3 years) X, AST <br /> Other testing or maintenance completed as required List them below: <br /> Test/Maintenance:AQMD x 8-29-16 <br /> Test/Maintena ace: <br /> Test/Maintenance: <br /> PRINTOUT INCLUD)EIU: Yes® No ❑ NA[PRINTOUT LEFT ON SITE:NBINDER UP TO DATE: <br /> Comments- <br /> NO ALARMS <br /> Items Requiring Follow-up Actions:N/A <br /> Monthly inspection must be conducted by an ICC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator,but not to State Water Resources. <br /> 17esignuator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that xnay require that may require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspections and any attachments for the previous <br /> 12 months. Records must be maintained on-site or, if approved by the local agency,off-site at a readily <br /> available location. <br /> 99/79 <br />