Laserfiche WebLink
Mr raviUty Employee Traiu!gg Page 2 of 2 <br /> All facility employees have received the required on-the-job traiDft within the past year. X <br /> All facility employees hired within the past 30 days have received the required on the job training. i x <br /> Mon Ins 'on— <br /> Y N NA Date Hone <br /> Monitoring system certification(within past 12 months) X 12-13-16 <br /> Spill Bucket testing completed(within past 12 months) X AST <br /> Leak Detector-mechanical/electronic for Most sites(wit k past 12 months) X 12-13-16 <br /> Ae above are usually done together on an annual basis for local regulator. <br /> Line Tigbtaess(usually upon construction or when no positive shutdown) X <br /> Tank Tightness(Usually only after construction or when using SIR) x <br /> Secondary comtaitument(SB989)tests have been completed(usually every 3 years) x AST <br /> Other testing or maintenance completed as required List them below: <br /> Test/Maintenance:AQMD X 8-29-16 <br /> Test/Maintmmce: <br /> TesuMaintenance: <br /> p9INTOUT INCLUDED: Yes® No ❑ NA❑PRINTOUT LEFT ON SITE:ZBMER UP TO DATE: <br /> Comments: <br /> NO ALARMS <br /> Items Requiring Follow-up Actions:N/A <br /> Monthly inspection must be conducted by an ICC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator,but not to State Water Resources. <br /> Designator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> izlspection that may require that may require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months. Records must be maintained on-site or,if approved by the local agency, off-site at a readily <br /> available location. <br /> 99/79 <br />