My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2300 - Underground Storage Tank Program
>
PR0231345
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 2:10:38 PM
Creation date
10/11/2018 2:12:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231345
PE
2381
FACILITY_ID
FA0003713
FACILITY_NAME
CHEVRON #95775 MCCOMBS* (INACT)
STREET_NUMBER
301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
02
SITE_LOCATION
301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Health and Safety Plan <br />Page 2 <br />Any modification in this Health and Safety Plan must be approved <br />by the property owner and Musco Excavators. <br />All Musco Excavators and subcontractor personnel must follow the <br />requirements of this Health and Safety Plan. Any unsafe <br />conditions must be promptly reported to the Site Safety and <br />Health Officer (SSHO), who will be Bryan Musco, or his appointed, <br />qualified person. <br />MUSCO EXCAVATORS SITE SAFETY and HEALTH OFFICER (SSHO) <br />The SSHO responsibilities include: <br />* Reviewing and confirming any changes in personal <br />protective clothing or respiratory protective <br />requirements. <br />* Reviewing all Health and Safety Documentation. <br />* Reviewing all on-site ambient air monitoring results. <br />* Providing site-specific training, as required, to all <br />personnel assigned to work at the site. <br />* Stopping work when unacceptable Health Safety Risk <br />exists. <br />* Providing a Health and Safety briefing to all site <br />visitors. <br />* Supervising decontamination to ensure complete <br />decontamination of all personnel, tools and equipment. <br />* Supervising the distribution, use, maintenance, and <br />disposal of personnel protective clothing and <br />equipment. <br />1.3 LIST OF PERSONNEL WITH 40 HOUR OSHA, 29 CFR FOR THIS PROJECT <br />Certified 40 Hour OSHA, 29 CFR 1910.120 Hazardous Waste <br />Operations: <br />Bryan Musco <br />
The URL can be used to link to this page
Your browser does not support the video tag.